HBT 2014 Big Giveaway - 4/10 Re-Draw Winners Posted!

Home Brew Forums > Home Brewing Beer > All Grain & Partial Mash Brewing > New manifold done and ready for sparging!




Reply
 
LinkBack Thread Tools Display Modes
Old 11-17-2012, 03:02 PM   #1
jfrank85
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jan 2011
Location: edwardsburg, MI
Posts: 792
Liked 14 Times on 13 Posts
Likes Given: 12

Default New manifold done and ready for sparging!

Got sick and tired of stuck sparges, fluctuating efficiency, and crappy vorlaufing due to mash paddle abuse to the braided line so I decided to build a manifold! Joints are cpvc and the tubes are rated up yo 180°F.

forumrunner_20121117_110213.jpg



__________________

Bottled:
Ereshkigal India Black Ale
Son of Ea India Amber Ale
Mauthe Doog India Brown Ale

Carboy:
Nothing atm

jfrank85 is offline
 
Reply With Quote Quick reply to this message
Old 11-17-2012, 03:17 PM   #2
Wynne-R
Feedback Score: 0 reviews
Recipes 
 
Join Date: Aug 2009
Location: Texas
Posts: 866
Liked 74 Times on 59 Posts
Likes Given: 72

Default

I have a square manifold with a single cross piece like yours. I replaced the cross pieces with solid (undrilled) tubing. It seems to have increased my efficiency a little bit in continuous sparging.

Mine is copper and slotted, but it ought to work the same.

You’ve probably got some left over tubing. You could try that if you feel like experimenting.



__________________
Wynne-R is offline
 
Reply With Quote Quick reply to this message
Old 11-17-2012, 03:27 PM   #3
jfrank85
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jan 2011
Location: edwardsburg, MI
Posts: 792
Liked 14 Times on 13 Posts
Likes Given: 12

Default

I generally do batch sparges but it wouldn't hurt doing some experimentation.

__________________

Bottled:
Ereshkigal India Black Ale
Son of Ea India Amber Ale
Mauthe Doog India Brown Ale

Carboy:
Nothing atm

jfrank85 is offline
 
Reply With Quote Quick reply to this message
Old 11-21-2012, 07:42 PM   #4
jfrank85
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jan 2011
Location: edwardsburg, MI
Posts: 792
Liked 14 Times on 13 Posts
Likes Given: 12

Default

Just did a mock run with the new manifold using water and one drop of black food coloring near TDC of the tun. The dye followed the path of least resistance, the center slots and didnt even think of going near the outside ring. I will make sure to make the adjustments and put a solid piece in the center, thanks again Wynne.

__________________
jfrank85 is offline
 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options
Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
fly sparging vs. batch sparging michaelpeach76 General Beer Discussion 13 10-03-2012 12:16 PM
Wort ready to be pitched...yeast starter not so ready Silverbullet Fermentation & Yeast 3 07-05-2012 06:03 PM
pilsen ready but not ready for lagering? maltbarleyhops Fermentation & Yeast 6 07-20-2011 03:41 AM
CPVC manifold for batch sparging allanmac00 All Grain & Partial Mash Brewing 15 01-18-2010 01:46 AM
Manifold Sparging problems thedisasterparty All Grain & Partial Mash Brewing 10 11-10-2009 04:44 PM