Ok, I have the rig ready to powdercoating I think. Just want input on anything you would add before coating.
I have added the following:
1. Swinging arm for controls
2. Gas plumbing brackets to hang gas line under rig
3. Pump brackets hug under center of rig
4. Plate to mount chiller on bottom rail with U-bolt
5. I left the burner cans loose to be powder coated separately
6. Individually adjustable burner can/burners
I am concerned about not having heat shields in the front of the keggles, but I'm not sure how to do it.
Anything you guys would recommend? This site is where I found almost all of these different ideas since I am a little challenged on the imagination front. It just seems that you guys seem to have an endless supply of unbelievable design ideas, so please fire away.
Thanks
I have added the following:
1. Swinging arm for controls
2. Gas plumbing brackets to hang gas line under rig
3. Pump brackets hug under center of rig
4. Plate to mount chiller on bottom rail with U-bolt
5. I left the burner cans loose to be powder coated separately
6. Individually adjustable burner can/burners
I am concerned about not having heat shields in the front of the keggles, but I'm not sure how to do it.
Anything you guys would recommend? This site is where I found almost all of these different ideas since I am a little challenged on the imagination front. It just seems that you guys seem to have an endless supply of unbelievable design ideas, so please fire away.
Thanks