Happy HolidaySs Giveaway - Last Sponsor Giveaway of the Year!

Come Enter the BrewDeals/FastFerment Giveaway!


Home Brew Forums > Home Brewing Beer > DIY Projects > Brew Stands > Building a BIAB structure...
Reply
 
LinkBack Thread Tools
Old 02-18-2012, 10:14 PM   #1
Hauntedyards
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jan 2012
Posts: 106
Liked 1 Times on 1 Posts

Default Building a BIAB structure...

I want to automate/control the banjo burner by using the Auber 1/16 DIN PID Temperature Controller and an ASCO solenoid valve for the propane. Maybe add a timer or two.

Would there be any point in utilizing the ramp/soak version in a one pot brew structure to control the various stages of the mash cycle?

__________________
Hauntedyards is offline
 
Reply With Quote Quick reply to this message
Old 02-18-2012, 11:02 PM   #2
phoenixs4r
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jun 2011
Location: Hayward, California
Posts: 1,513
Liked 55 Times on 50 Posts
Likes Given: 38

Default

I gave up on electric brewing but I still am intrigued so I go over there quite a bit and lurk. This was posted yesterdayish..... is this what you're asking?

http://www.homebrewtalk.com/f170/pid...-2352p-305218/

__________________
phoenixs4r is offline
 
Reply With Quote Quick reply to this message
Old 03-08-2012, 01:29 AM   #3
Hauntedyards
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jan 2012
Posts: 106
Liked 1 Times on 1 Posts

Default

Well after looking at fortydegnorth's BIAB structure I have been forced to redesign mine to comply with the awesome small form factor. It was a corner island style spanning 8 feet but it will now be in style of this design:

http://www.homebrewtalk.com/f51/biab...t-pump-310459/

I'm going to try to stay inside the 4' square foot print (easy to get in doors and sheds). This was just a sketch I did at work today... (intellectual property rights lost!)

Any thoughts on this design... I'll probably extent the front feet forward so that I can winch up full 20 gallon pots if need be without fear of tipping.

The back splash, bottom shelf, and front heat shield will be diamond aluminum sheet. It will hide all of the plumbing (pot filler faucet, water filter, etc) and electrical cords for the small 200lb gantry winch (controls will be rewired to the control panel).

The control panel will be a brutus style on an arm to the side.

photo.jpg  
__________________
Hauntedyards is offline
 
Reply With Quote Quick reply to this message
Reply



Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Structure advice for an All-Grain newbie USCDiver Brew Stands 12 02-16-2012 12:38 AM
Modular Brew Structure Nostrildamus Brew Stands 9 06-08-2011 08:04 PM
Show me your WOOD! (structure that is) No electric, No pump nshuey825 Brew Stands 16 03-01-2011 01:24 PM
Beginner Beer Structure/Rig mattybrews Brew Stands 3 03-23-2009 11:56 PM
Building a Wet Bar Lepoc2635 Kegerators and Keezers 9 07-27-2007 11:03 PM



Newest Threads

LATEST SPONSOR DEALS