Home Brew Forums

Home Brew Forums (http://www.homebrewtalk.com/forum.php)
-   Brew Stands (http://www.homebrewtalk.com/f253/)
-   -   Brewtius Maximus/The Braxton 10 Complete Single Tier Build (http://www.homebrewtalk.com/f253/brewtius-maximus-braxton-10-complete-single-tier-build-352087/)

BraxtonBrewery 09-07-2012 05:33 PM

1 Attachment(s)

Here are the dimensions that I have reworked. This should give me plenty of space, and make a very clean, nice looking, compact rig.

My next post will be my cut list. Hopefully very soon after this one.


BraxtonBrewery 09-07-2012 11:22 PM

2 Attachment(s)

Picked up the majority of the raw materials today before work. 48' of 2X2 11gauge (1/8") thick square tube and the diamond plate shelf. Now it's time to get cutting and welding to get this thing built!


BraxtonBrewery 09-07-2012 11:22 PM

2 Attachment(s)

Picked up the majority of the raw materials today before work. 48' of 2X2 11gauge (1/8") thick square tube and the diamond plate shelf. Now it's time to get cutting and welding to get this thing built!


BraxtonBrewery 09-08-2012 01:58 AM

4 Attachment(s)

The UPS man is getting me warmed up for the stuff I'll be getting next week. The first picture is how I'm going to mount my control panel, followed by my regulator, and one of the 3 sets of garden hose quick disconnects for ease of connectivity when chilling or moving the garden hoses around.

Ordered but not yet here: 3 banjo burners, 2 SS chuggers, 30 plate chiller, fittings, cams, control panel enclosure, and the drawers.


BraxtonBrewery 09-08-2012 01:58 AM

4 Attachment(s)

The UPS man is getting me warmed up for the stuff I'll be getting next week. The first picture is how I'm going to mount my control panel, followed by my regulator, and one of the 3 sets of garden hose quick disconnects for ease of connectivity when chilling or moving the garden hoses around.

Ordered but not yet here: 3 banjo burners, 2 SS chuggers, 30 plate chiller, fittings, cams, control panel enclosure, and the drawers.


BraxtonBrewery 09-08-2012 01:58 AM

4 Attachment(s)

The UPS man is getting me warmed up for the stuff I'll be getting next week. The first picture is how I'm going to mount my control panel, followed by my regulator, and one of the 3 sets of garden hose quick disconnects for ease of connectivity when chilling or moving the garden hoses around.

Ordered but not yet here: 3 banjo burners, 2 SS chuggers, 30 plate chiller, fittings, cams, control panel enclosure, and the drawers.


BraxtonBrewery 09-08-2012 01:58 AM

4 Attachment(s)

The UPS man is getting me warmed up for the stuff I'll be getting next week. The first picture is how I'm going to mount my control panel, followed by my regulator, and one of the 3 sets of garden hose quick disconnects for ease of connectivity when chilling or moving the garden hoses around.

Ordered but not yet here: 3 banjo burners, 2 SS chuggers, 30 plate chiller, fittings, cams, control panel enclosure, and the drawers.


BraxtonBrewery 09-09-2012 07:13 PM

2 Attachment(s)

Yesterday I got a couple more packages. Got my 3 banjo burners and my 2 Eva drys for my Keezer.

Tomorrow I'm cutting all my steel and hope to have it welded by next weekend. We will see how that goes!


BraxtonBrewery 09-09-2012 07:13 PM

2 Attachment(s)

Yesterday I got a couple more packages. Got my 3 banjo burners and my 2 Eva drys for my Keezer.

Tomorrow I'm cutting all my steel and hope to have it welded by next weekend. We will see how that goes!


BraxtonBrewery 09-11-2012 01:08 AM

11 Attachment(s)

Got a lot done today. Last night I was up until about 12:30 for an Impromptu brew night. My garage was taken over with "stuff" Between getting a new patio poured and brewing stuff, I couln't get my stand out. So I didn't use it. Everything went well.

On the progress, I went to my local tool rental place and rented a chop saw for $23 for the day. It came with a blade on it and I bought an extra one for $12. So for $35 plus tax, i was able to get all my steel cut.

Then... Half way through the steel cutting my postman delivered the first box of my goodies! My pumps and plate chillers. I was pumped. Can't wait to start welding and get it all put together.

Lastly is the rough.. and I mean very rough lay out of how the top shelf where the kegs sit will look. I'll square everything up and make sure its a tight fit before I weld it. All those 45 degree cuts were tough, the saw guide kept changing it self on me.

Let me know what you think, and I'll keep you posted as I make progress - I'm not sure when I will be able to get it all welded.



All times are GMT. The time now is 01:10 PM.

Copyright ©2000 - 2015, Jelsoft Enterprises Ltd.