kdomrose 12-28-2011 06:35 PM

Update on brewrig
 
5 Attachment(s)

Ok..OK.. I know I haven't updated anything here in a while. I have been working on the rig.

Here are some pictures of where things are at.

I have the electrical controls all completed and tested. The gas lines and valves are all run and tested.

All that is left is the liquid lines. I am hoping to get things completed this week and to pop the cherry on this thing on January 2nd.


kdomrose 12-28-2011 06:35 PM

Update on brewrig
 
5 Attachment(s)

Ok..OK.. I know I haven't updated anything here in a while. I have been working on the rig.

Here are some pictures of where things are at.

I have the electrical controls all completed and tested. The gas lines and valves are all run and tested.

All that is left is the liquid lines. I am hoping to get things completed this week and to pop the cherry on this thing on January 2nd.


kdomrose 12-28-2011 06:35 PM

Update on brewrig
 
5 Attachment(s)

Ok..OK.. I know I haven't updated anything here in a while. I have been working on the rig.

Here are some pictures of where things are at.

I have the electrical controls all completed and tested. The gas lines and valves are all run and tested.

All that is left is the liquid lines. I am hoping to get things completed this week and to pop the cherry on this thing on January 2nd.


kdomrose 12-28-2011 06:35 PM

Update on brewrig
 
5 Attachment(s)

Ok..OK.. I know I haven't updated anything here in a while. I have been working on the rig.

Here are some pictures of where things are at.

I have the electrical controls all completed and tested. The gas lines and valves are all run and tested.

All that is left is the liquid lines. I am hoping to get things completed this week and to pop the cherry on this thing on January 2nd.


kdomrose 12-28-2011 06:35 PM

Update on brewrig
 
5 Attachment(s)

Ok..OK.. I know I haven't updated anything here in a while. I have been working on the rig.

Here are some pictures of where things are at.

I have the electrical controls all completed and tested. The gas lines and valves are all run and tested.

All that is left is the liquid lines. I am hoping to get things completed this week and to pop the cherry on this thing on January 2nd.