Here is my rough rendering of my planned brew stand



It will be made of 1 1/2 x 1 1/12 perforated angle, iron two kegs on two burners and a Ice Cube MTL (Blue). The stand will be 72 inches wide, 16 inches deep and 32 inches high.

The Bk will go on the lower section (20 x 16) and sit 10 inches off the ground. The wheels will be 2 inches high with the base 8 inches.

The upper section will be 32 inches high (52x16) and will support the MLT and HLT. The top of the MLT will end up being 52 inches off the ground so I won't need to stand on anything to dough in or stir.

I will pump from the HLT to the MLT, gravity from the MLT to the BK and the pump to whirlpool recirlulate/xfer to fermenter.

Material cost (McMaster part #) so far are $108.15
4664T61 x 1 - 12.89
8968K26 x 11 - 8.66

Future projects to include hard piping for the gas lines and a water filter.

__________________
atl_sud is offline
 
Reply With Quote Quick reply to this message
Old 03-05-2009, 05:09 PM   #2
BlackNotch
Feedback Score: 0 reviews
Recipes 
 
Join Date: Aug 2008
Location: Wilmington, DE
Posts: 141
Liked 3 Times on 3 Posts
Likes Given: 1

Default

I was thinking of a similar set up, but wasn't sure how the cooler would hold up to the radiant heat of the burners.

Check out this set up . My kegs are being welded this week, so I plan on starting the project this spring.

__________________

-Mike

BlackNotch is offline
 
Reply With Quote Quick reply to this message
Old 03-05-2009, 06:00 PM   #3
atl_sud
Feedback Score: 0 reviews
Recipes 
 
Join Date: Mar 2009
Location: Marietta, GA
Posts: 23
Likes Given: 1

Default

Quote:
Originally Posted by wfd146 View Post
I was thinking of a similar set up, but wasn't sure how the cooler would hold up to the radiant heat of the burners.

Check out this set up . My kegs are being welded this week, so I plan on starting the project this spring.

The edge of the BK is ~4 inches from where the sculpture begins to rise. One side of the MLT is 13 inches from the HLT. I plan on resting the MLT on a piece of cement board. Hopefully, this will shield the plastic cooler. Otherwise this will accelerate my progression to a 3 keg setup.
__________________
atl_sud is offline
 
Reply With Quote Quick reply to this message
Reply



Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
3 Tier Tree Sculpture Plans? HenryHill Equipment/Sanitation 18 11-07-2013 01:09 PM
My two tier build nostalgia Brew Stands 14 06-28-2009 05:46 PM
Time to take the plunge... Single Tier Plans Anthony_Lopez Brew Stands 67 05-08-2009 02:22 AM
build plans kdp Equipment/Sanitation 1 09-17-2008 07:16 PM
Beginning Plans for Bar Build MrShake Kegerators and Keezers 21 06-04-2008 09:10 PM



Newest Threads

LATEST SPONSOR DEALS