Happy HolidaySs Giveaway - Last Sponsor Giveaway of the Year!

Come Enter the BrewDeals/FastFerment Giveaway!


Home Brew Forums > Home Brewing Beer > DIY Projects > Kegerators and Keezers > Lorglath's ~19Ft^3 Oak Keezer Project with Cigar Band Top
Reply
 
LinkBack Thread Tools
Old 08-21-2012, 06:42 PM   #1
lorglath
HBT_SUPPORTER.png
Feedback Score: 1 reviews
 
lorglath's Avatar
Recipes 
 
Join Date: Sep 2011
Location: Minneapolis, MINNESOTA
Posts: 218
Liked 7 Times on 6 Posts
Likes Given: 6

Default Lorglath's ~19Ft^3 Oak Keezer Project with Cigar Band Top

My goal for this project is two bring my two passions together, home brewing, and cigars. The three projects that I am basing this off of mostly are:

Ksanz Minimum Woodworking Keezer - Link
G8tor's Keezer - Link
Cigar Band Table - Link

Images below
Ksanz finished product:


G8tor's finished product:


Cigar band table:


I figured this would be a good place to add the latest picture so you can keep up with just the top post if you wanted

__________________
lorglath is offline
 
Reply With Quote Quick reply to this message
Old 08-21-2012, 06:43 PM   #2
lorglath
HBT_SUPPORTER.png
Feedback Score: 1 reviews
 
lorglath's Avatar
Recipes 
 
Join Date: Sep 2011
Location: Minneapolis, MINNESOTA
Posts: 218
Liked 7 Times on 6 Posts
Likes Given: 6

Default

Post dedicated to the base of the cabinet's construction:

Basic chest freezer I got off of craigslist for $160


Showing the tower that will be going on top, roughly in it's place


Measured and drawn areas for hole locations for two tower tapper


8 kegs pictured, it can hold 9, I think I'll have to put the CO2 tank on the outside and hose it in.


working area


drilling holes for the pocket screws


base assembled


showing a close up of the pocket screw holes


I was contemplating making a similar top to ensure it was sturdy enough for the epoxy top, after talking with a co-worker, I am going to reinforce the 3/4" plywood with aluminum U channel to add rigidity to the top, and attach the board directly to the topper


attaching the casters, pre-drilled all the holes, then ratcheted in the lag screws until nice and tight


Attaching the uprights, again with pocket screws, they have an amazingly strong grip. I used 2x6 everywhere because I found a TON of 2x6's at the menards scrap bin for around $0.60 each, and they were long enough for my needs so I used them.


Different angle


adding uprights for the sides


close-up of the inside corner. One thing to mention, I had to replace the left corner here because the first piece of wood I used was warped and didn't make a square corner. Make sure your boards are roughly true before you buy them or you will be re-doing your project in order to make it work


Securing the corner pieces together with 1 pre-drilled wood screw


Supports on. I was planning on putting them all the way to the top, but decided I would rather there be some air flow, so I put them down a little. I was glad I did, because the risers are about a cm too tall in some areas and I need to chop / sand it down. I am happy I only have a limited area I need to do that too.


Freezer in!


Mostly right on with the level


cut the oak face board


Another shot of the oak face board before it was attached


Attached the oak face board, again, pre drilling before I screwed, measurements and cuts were almost dead on!
Pointer: make sure to measure the top and bottom, because the cube is likely not the same dimensions on the top as the bottom for width.


Another shot from the other side


Secured a board on the back to add structure and support to the frame


Showing the gap around the freezer for air flow.


I spent some time cleaning up the wiring in the back. Since it only pulls 4A, I just connected it directly to the controller rather than having the contactor in line with it.

__________________
lorglath is offline
2
People Like This 
Reply With Quote Quick reply to this message
Old 08-21-2012, 06:44 PM   #3
lorglath
HBT_SUPPORTER.png
Feedback Score: 1 reviews
 
lorglath's Avatar
Recipes 
 
Join Date: Sep 2011
Location: Minneapolis, MINNESOTA
Posts: 218
Liked 7 Times on 6 Posts
Likes Given: 6

Default



started adding the oak trim. I ripped the boards down from roughly 1x12's to about 2.5" each, miter cut the corners of the front at 45 degrees, sides are just butt joints


there was some bowing in the front and sides at the top, which is why I used clamps and some liquid nails to keep them together before I used 2" finishing nails to tag them together.




View from the front


showing that I am using some liquid nails as additional support.


started on the left side


remember when I said to use true boards... apparently I didn't listen to my own advice. My corner piece is bowed and I had to put a shim inbetween the boards to ensure the outsides were together, I also had to cut the front a little longer to compensate for this.


I also had to shim the vertical board, but no one will see from this angle so I am not concerned.


made this piece a bit thinner so the total width would match up since a portion of the width is made up from the front board it is joining up to.


finished base (before filler, sanding, staining and what-not)


We tried taking the top off, but found that the inside had styrafoam inside instead of fiberglass insullation, therefore I didn't need to pop it off. We started drilling holes!


We drilled from the top down, got through the metal, used a longer drill bit to break through the plastic, then cut up from the inside for clean cuts.


A picture of the top piece of wood cut to size


I also cut down the aluminum U channel and set on top board for illustration. I decided to use U channel to add rigidity to the board. Since I am planning on using an epoxy topper, I didn't want any flex in the top. I figure with lots of lag bolts attaching it to the top of the freezer, and U channel surrounding the device, there wouldn't be much room for the top board to flex and pop off the epoxy top.


I realized this would be an easier way to attach, so I flipped the top board onto its back and started installing the Aluminum U Channel. To do this I pre-drilled holes for the lag bolts, cleaned up the mess, used some liquid nails, pre-drilled a sink hole on the opposite side so the heads would sink in, and started going to town.


here is a shot of the sunk in heads


attached the top to the lid


To do this we drilled holes, then drilled a larger hole through the lid to allow for us to screw up the bolts. a few pics ago I showed that I had countersunk the bolts on the aluminum u channel, that proved to be unnecessary, as if using a drill to tighten the bolts, they sink in quite nice on their own


top in place with wood surround cut to size, just tacked in place for the time to ensure a good fit


We used more liquid nails to attache the top surround and perpendicular boards that hide the U channel. We also tacked with a finishing nailer.


Gluing scrap boards together so we can make a riser for the tap system so it doesn't sit in the epoxy, glued 3 together in total


We used a drill press to cut the larger circles out of our glued together scrap boards


Then used the same pilot hole to cut the 3" circle out of the center


Which left us with a nice riser to set the tap on
__________________
lorglath is offline
 
Reply With Quote Quick reply to this message
Old 08-21-2012, 06:44 PM   #4
lorglath
HBT_SUPPORTER.png
Feedback Score: 1 reviews
 
lorglath's Avatar
Recipes 
 
Join Date: Sep 2011
Location: Minneapolis, MINNESOTA
Posts: 218
Liked 7 Times on 6 Posts
Likes Given: 6

Default

here is a pic with the top mocked up on top of the risers


we then started the finishing process: Had to sink the finishing nails and add wood filler


then we sanded it with a belt sander (which I got carried away with in some areas and there are some gouges we couldn't get out, be careful with a belt sander! My advice, take it down most of the way with a belt sander, then use elbow grease and 100 grit to finish it off. after the belt sander we did 120 grit by hand, 220 grit, and 400 grit... after the 400 grit it was shining!






There was some spacing where the side panels met up, filled it with wood filler, hope it turns out okay after the stain.


Here it is after stain was applied. I went with this color "Red Mahogany" because it is the same as the other piece of woodwork in the man-cave, so it was fitting


different angle, still wet


3rd angle, still wet


3rd angle again the next AM once it was dried


Apparently I didn't take any pics of us putting 3 coats of oil based poly on it, but it is done, and looking good... now onto the top with cigar labels!

we started with a pretty thin smattering. We used Elmers glue and added a bit of water to thin it down. We would use a paint brush to apply over an area, say 8"x8" and then put the labels down once the glue tacked up a bit. Some edges came up, but we just kept pushing them down or added glue on top until they stayed put... This part of the project is going to take a while.


About 1/2 done, with the 1st pass of the 1st layer


So I had to ask for some help from some fellow BOTLs (Brothers of the leaf) and boy did they deliver on extra bands!


I decided to do a solid first layer now that I had plenty of bands, the 2nd and 3rd layer of bands will be much less dense.

View from the right


View from the left


Top view... starting to look up!!! Now I just have to wait until my 4 gallons of epoxy come in!


More to come soon!

__________________
lorglath is offline
 
Reply With Quote Quick reply to this message
Old 08-21-2012, 06:45 PM   #5
lorglath
HBT_SUPPORTER.png
Feedback Score: 1 reviews
 
lorglath's Avatar
Recipes 
 
Join Date: Sep 2011
Location: Minneapolis, MINNESOTA
Posts: 218
Liked 7 Times on 6 Posts
Likes Given: 6

Default

The epoxy came in and I have more pictures to share! I didn’t end up taking a lot of pictures between the layers of epoxy, but you get the idea of it. Below is a small sampling of the pictures I took while creating it that tell the story…

First off you need to make sure the top is level


One last pic of the first layer before epoxy


Carefully stirring the epoxy as to not add bubbles, you can see the slight swirls in it, it is good to go when you can no longer see em.


Dumped the contents on top the top, and spread them around with a piece of plastic


Use heat gun to pop bubbles and smooth out layer


First layer done and smooth


Close up after the first layer


Skip to the final layer of cigar labels


Here is a lesson to you… when using epoxy, don’t try to pop bubbles after it has start to set up, I ended up causing a ton of ripples in what could have been the last layer, had to do all 4 layers of expoxy because of this… notice the reflections on the bottom part of the light


You can really see the depth between the layers


Shameless plug for the CRA


First label laid surrounded by his brothers

Top done


Tap installed


Went with a heavier gauge screw


Taps on, starting to run line


Left most tap will be a stout tap, in shipping right now


Pouring beer!


Me and the guys that helped along the way!

__________________
lorglath is offline
Dcinaustin Likes This 
Reply With Quote Quick reply to this message
Old 08-21-2012, 08:51 PM   #6
nickmv
HBT_SUPPORTER.png
Feedback Score: 0 reviews
Recipes 
 
Join Date: Mar 2010
Location: Memphis
Posts: 777
Liked 60 Times on 48 Posts
Likes Given: 4

Default

This is going to be an epic project. Looking forward to seeing the progress.

__________________

Primary #1 (SS Brew Bucket):
Primary #2 (SS 7G Chronical):
Primary #3 (Better Bottle): Rye Saison
Secondary #1: Pinot Grigio Kit
Secondary #2: Pinot Grigio Kit
Secondary #3: Gewurztraminer Kit
On-Deck:
Kegged & Waiting: Citra Black IPA
ON TAP: n/a
2014 Beers So Far:
Belgian Wit | Burton IPA | Belgian Wit | Black IPA | Rye Saison | Hefeweizen

nickmv is offline
 
Reply With Quote Quick reply to this message
Old 08-21-2012, 09:18 PM   #7
socalboomer
HBT_SUPPORTER.png
Feedback Score: 0 reviews
Recipes 
 
Join Date: Mar 2011
Location: Riverside, CA
Posts: 215
Liked 4 Times on 3 Posts
Likes Given: 6

Default

Quote:
Originally Posted by lorglath View Post
Make sure your broads are roughly true before you buy them or you will be re-doing your project in order to make it work
I like my broads true. . .


sorry, too much temptation and I couldn't resist. . .
__________________

On Tap (Nitro): Chocolate Palomino - just kicked! ACK
On Tap 1: empty. . .On Tap 2: empty. . .On Tap 3: Flawed Garnet (black currant saison)
In Secondary:
In Primary:
Next up: Gold Dust Pale Ale

socalboomer is offline
 
Reply With Quote Quick reply to this message
Old 08-22-2012, 12:47 AM   #8
Hoppopotomus
Cedar Hollow Brewing
HBT_SUPPORTER.png
Feedback Score: 0 reviews
 
Hoppopotomus's Avatar
Recipes 
 
Join Date: Nov 2010
Location: Ortonville/Oxford, Michigan
Posts: 1,448
Liked 85 Times on 74 Posts
Likes Given: 118

Default

Can't wait to see this one come together! Cheers!

Hoppo

__________________
Cedar Hollow Brewing

Hoppo's Rustic Basement Bar Build:

Hoppo's Knotty Pine/Cedar Log Keezer Build:

Hoppo's Rustic Dual Fermentation Chamber Builds:

Hoppo's Motorized Grain Mill:

Hoppo's Rustic E-Brewery Build:
Hoppopotomus is online now
 
Reply With Quote Quick reply to this message
Old 08-22-2012, 12:49 AM   #9
knuckleheadbrewing
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jul 2012
Location: North Georgia, GA
Posts: 187
Liked 27 Times on 21 Posts
Likes Given: 35

Default

wow totally awesome!

__________________
Knucklehead Brewing Co.
Tap 1: La Petite Lemon
Tap 2: Apfelwein
Fermenter 1: Anarchy Red IPA
Fermenter 2:
Fermenter 3:
Fermenter 4:
Kegged/Bottled:
Coming Soon:Strawbeery Blond, Westmalle Triple Clone
www.facebook.com/knuckleheadbrewing
www.knuckleheadbrewing.com
knuckleheadbrewing is offline
 
Reply With Quote Quick reply to this message
Old 08-22-2012, 04:56 AM   #10
lorglath
HBT_SUPPORTER.png
Feedback Score: 1 reviews
 
lorglath's Avatar
Recipes 
 
Join Date: Sep 2011
Location: Minneapolis, MINNESOTA
Posts: 218
Liked 7 Times on 6 Posts
Likes Given: 6

Default

Quote:
Originally Posted by socalboomer View Post
I like my broads true. . .


sorry, too much temptation and I couldn't resist. . .
fixed, thanks
__________________
lorglath is offline
 
Reply With Quote Quick reply to this message
Reply



Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Project: Keezer CallsignMigs Kegerators and Keezers 18 04-20-2013 09:44 PM
Keezer Project! runt23 Kegerators and Keezers 2 06-07-2012 12:04 AM
New Keezer Project chipsah Kegerators and Keezers 20 06-29-2011 09:40 AM
Keezer project mikee Kegerators and Keezers 2 03-15-2011 03:02 AM
Keezer Project v1.0 a W.I.P. TerryWendel Kegerators and Keezers 5 12-14-2008 09:23 PM



Newest Threads

LATEST SPONSOR DEALS