Happy HolidaySs Giveaway - Last Sponsor Giveaway of the Year!

Come Enter the BrewDeals/FastFerment Giveaway!


Home Brew Forums > Home Brewing Beer > DIY Projects > Kegerators and Keezers > HBT members inspired me: My Keezer Project
Reply
 
LinkBack Thread Tools
Old 12-17-2009, 06:46 PM   #81
skibumdc
HBT_SUPPORTER.png
Feedback Score: 0 reviews
Recipes 
 
Join Date: Oct 2008
Location: NoVa
Posts: 214
Liked 4 Times on 4 Posts

Default

Landin, a suggestion.
Make the fan that flows cold air into the beer line tube run full time, NOT just when the compressor runs.
The tube will warm up above 38* before the compressor kicks on and the CO2 will break out of the beer.

I've helped a lot of people out on regular kegerators (Summit/Sanyo/Danby/True, etc.) all benefit from tower cooling tremendously. Don't see why this little addition couldn't help you as well.
I've read up a lot at Micromatic's forum. Take a gander over there and see some of the ways people have built tower coolers well.

__________________
skibumdc is offline
 
Reply With Quote Quick reply to this message
Old 12-17-2009, 07:02 PM   #82
jlandin
Feedback Score: 0 reviews
Recipes 
 
Join Date: Nov 2009
Location: Mel Bch, FL-US
Posts: 179
Liked 13 Times on 6 Posts

Default

Quote:
Originally Posted by skibumdc View Post
Landin, a suggestion.
Make the fan that flows cold air into the beer line tube run full time, NOT just when the compressor runs.
Thanks for the tip!

--
Josh
__________________
jlandin is offline
 
Reply With Quote Quick reply to this message
Old 12-17-2009, 07:11 PM   #83
jlandin
Feedback Score: 0 reviews
Recipes 
 
Join Date: Nov 2009
Location: Mel Bch, FL-US
Posts: 179
Liked 13 Times on 6 Posts

Default

Quote:
Originally Posted by kegtoe View Post
Landin, i was refering to the fram aroune the entire top? how is that attached? Only to the plywood on the freezer lid?
Yes. There are 3 pieces of trim going on there. They are all wood-glued, corners cut on 45's, and pneumatically stapled in place. The widest piece is vertical under the 3/4 plywood. Then a skinnier piece along the outer edge of the plywood, flush with the plywood surface. The third piece is a wider horizontal overhang on the plywood surface and the second piece of trim. It's all bound together really solid, and all corners are cross-stapled.

--
Josh
__________________
jlandin is offline
 
Reply With Quote Quick reply to this message
Old 12-29-2009, 05:30 PM   #84
johnnyc
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jan 2009
Location: North Atlanta, GA
Posts: 688
Liked 9 Times on 7 Posts

Default

Quote:
Originally Posted by jlandin View Post
Not secured, though they fit pretty snug. The duct is easily removable. To do so I just back-off the shank nuts nearly all the way and push the shanks forward (extending them out of the coffin) which allows them to "leave" the duct. Then the duct can be lifted out of the female bases and laid down. All the while the beer lines are sliding out the holes (still attached to the shanks) allowing me to change a line, etc.

--
Josh
Are those 4" shanks? Did you estimate right on the length you needed?

EDIT: Never mind I found the parts list. Just ordered my taps and shanks from Rapids Wholesale. Now to start construction
__________________

Kegged: Hoppy Amber, ESB, Weizenbock, Breakfast Stout, IPA

Fermenting: Yooper's Oktoberfest


johnnyc is offline
 
Reply With Quote Quick reply to this message
Reply



Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
The 'Keezer' Project Jester369 Kegerators and Keezers 452 10-04-2014 12:31 AM
Keezer Project elmetal Kegerators and Keezers 3 12-20-2010 12:55 PM
Keezer Project - Add a Collar maxbing Kegerators and Keezers 5 02-17-2009 03:35 PM
Keezer Project v1.0 a W.I.P. TerryWendel Kegerators and Keezers 5 12-14-2008 09:23 PM
My keezer project Mustangfreak Kegerators and Keezers 12 12-14-2008 09:43 AM



Newest Threads

LATEST SPONSOR DEALS