I have been working on this for some time now, and recently made some more progress. This project has evolved several times over the course of the build, so I have had to improvise along the way. I now have a name for my space, and am about 80% done. It is to the point of being a functional space so I plan to use it while I continue working as I can find the time. However my current priority is to complete my electric brew rig.

Some pictures of the build here:

Another Bar Build - Home Brew Forums

Current pics

My Keezer bar




My electric setup will go where these chairs currently sit.


The laundry hookup was an add on. I plan to use it as my brewing water supply and for use with wort chiller. In the original plans the fireplace was going to be a natural gas BBQ pit, I even had a commercial vent for it. Where the laundry hookup is was supposed to be a counter top with a sink. About halfway through the build swmbo decided we should add a fireplace so my BBQ pit became a natural gas grill that sits outside


Need to build or find a Fireplace mantel just not sure how I should procede here. If anyone has any suggestions, let me know.





Hope to make some more progress now that this space is at least usable. Will add more pics as I make progress.

__________________
zazbnf is offline
 
Reply With Quote Quick reply to this message
Old 01-01-2012, 06:58 PM   #2
zazbnf
Senior Member
HBT_SUPPORTER.png
Feedback Score: 4 reviews
 
zazbnf's Avatar
Recipes 
 
Join Date: Dec 2010
Location: , Illinois
Posts: 518
Liked 59 Times on 39 Posts
Likes Given: 19

Default

I have my electric control panel nearly finished am waiting on the contactors, special thanks go out to P-J for his advice and for the schematic.





I have the HLT nearly finished and will update with pics as soon as I get a moment.

__________________
zazbnf is offline
 
Reply With Quote Quick reply to this message
Old 01-01-2012, 06:59 PM   #3
zazbnf
Senior Member
HBT_SUPPORTER.png
Feedback Score: 4 reviews
 
zazbnf's Avatar
Recipes 
 
Join Date: Dec 2010
Location: , Illinois
Posts: 518
Liked 59 Times on 39 Posts
Likes Given: 19

Default

Ok, finally made some more progress. put the stand together in about 30 minutes. I plan to weld up something later, but this will get me started.





HLT



__________________
zazbnf is offline
 
Reply With Quote Quick reply to this message
Old 03-01-2012, 01:38 AM   #4
zazbnf
Senior Member
HBT_SUPPORTER.png
Feedback Score: 4 reviews
 
zazbnf's Avatar
Recipes 
 
Join Date: Dec 2010
Location: , Illinois
Posts: 518
Liked 59 Times on 39 Posts
Likes Given: 19

Default






Still need to get the stir motors mounted for the HLT and the IC lid.
__________________
Quote:
There are better things in life than alcohol, but alcohol makes up for not having them.
- Terry Pratchet
zazbnf is offline
 
Reply With Quote Quick reply to this message
Old 01-21-2013, 06:14 PM   #5
zazbnf
Senior Member
HBT_SUPPORTER.png
Feedback Score: 4 reviews
 
zazbnf's Avatar
Recipes 
 
Join Date: Dec 2010
Location: , Illinois
Posts: 518
Liked 59 Times on 39 Posts
Likes Given: 19

Default

I have added some upgrades replaced all 3 vessels, and made a keggle mash tun with amnifold. I made the manifold for my bottom drain kettle so it would screw into place. It sits about 3/4" away from the bottom on the outer edges and a couple inches high in the middle.


To reduce dead space I actually drilled 1/8" holes in the base of the copper manifold fitting that screws into my stainless mash tun fitting. I think this allows the highest gravity wort resting on the very bottom to slowly drain out without providing enough flow to allow channeling.


The center fitting I had to make by drilling a hole through the side of a T fitting and sliding a piece of copper pipe with a hole drilled through so the copper pipe hole was facing down. Then I had to solder it in place. You'll have to forgive my poor soldering, I am definately not a plumber.

With manifold installed.


I currently fly sparge and I made this sparge arm so I could use different lengths of slilicone tubing to adjust height depending on my mash volume.


This is my current setup, I recently replicated the process by building a 1 gallon brewery for test batches (without the pumps).


This spring when it warms up, I plan to add legs to the other 2 keggles and get rid of my improvised wooden brewstand.

__________________
Quote:
There are better things in life than alcohol, but alcohol makes up for not having them.
- Terry Pratchet
zazbnf is offline
 
Reply With Quote Quick reply to this message
Old 01-21-2013, 07:14 PM   #6
patthebrewer
Manasquan River Brewing LLC
HBT_SUPPORTER.png
Feedback Score: 0 reviews
 
patthebrewer's Avatar
Recipes 
 
Join Date: Sep 2012
Location: , allenwood, nj
Posts: 688
Liked 55 Times on 48 Posts
Likes Given: 141

Default

looking Good!

__________________
Manasquan River Brewing LLC
patthebrewer is offline
 
Reply With Quote Quick reply to this message
Reply



Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Backyard Brewpub Layne Kegerators and Keezers 685 10-13-2014 10:53 PM
Ice Cream Cooler Conversion....to build or not to build. natebomb Kegerators and Keezers 7 10-16-2011 07:54 PM
Keggle Build: Where to Install Ball Valve? ultravista Kettles, Mash Tuns, & Hot Liquor Tanks 7 01-25-2011 07:10 PM
made some progress on my bar build/ keezer build 802VermontHomebrew Kegerators and Keezers 17 08-22-2010 02:20 PM
Input on home brewpub Belmont Kegerators and Keezers 56 05-08-2009 08:30 PM



Newest Threads

LATEST SPONSOR DEALS