Not a whole lot to report, SWMBO had a honey do list I spent 12 hours on last Saturday then Sunday she spent 8 hours shopping so I got to take care of the seven month old monkey man.
I did discover I needed to order more wire to connect my 2 and 3 way motorized ball valves, one more thing that got lost in the shuffle.
After reading the
GFCI keeps blowing thread I got paranoid about my JB Weld potted elements. Never fear!! I hooked up the BK element since it already had water in it from my leak test and flipped the switch to manual control and voila! It was pretty cool to hear the hissing of the water warming up and NOT hear the click of the GFCI!!!
Leaving for Christmas tomorrow morning so the build will sit patiently waiting for me to finish her up (more patiently than me unfortunately).
Hopefully the SWMBO will let me spend some time on it so I can maybe give her the inaugural brew on New Year's Day
Merry Christmas everyone!!