Happy HolidaySs Giveaway - Winners Re-Re-Re-Re-Drawn - 24 hours to Claim!

Get your HBT Growlers, Shirts and Membership before the Rush!


Home Brew Forums > Home Brewing Beer > Electric Brewing > So who's worked in their main electrical panel?
Reply
 
LinkBack Thread Tools
Old 01-28-2013, 08:31 PM   #1
kevreh
Feedback Score: 0 reviews
Recipes 
 
Join Date: Sep 2012
Location: Annandale, VA
Posts: 225
Liked 12 Times on 10 Posts
Likes Given: 11

Default So who's worked in their main electrical panel?

Just wondering how many out there worked in their main (house) panel to do wiring for their e-brewery. I understand the safety side (turn off main breaker, test leads, don't wear metal jewlery, etc..). I've done quite a bit electrical for remodelling, but am still a little spooked by it. Any success stories?

BTW, to make it 100% safe, is it possible to disconnect power to my house via the meter outside?


TIA

__________________
On tap: Summer Ale, Vienna Lager/Ale
In the fermenter: 59 Minute IPA
On deck: Two Hearted IPA

My eBrewery
kevreh is offline
 
Reply With Quote Quick reply to this message
Old 01-28-2013, 08:53 PM   #2
Hammy71
Senior Member
HBT_SUPPORTER.png
Feedback Score: 0 reviews
 
Hammy71's Avatar
Recipes 
 
Join Date: Sep 2008
Location: , Maryland, The Tax Me State
Posts: 5,665
Liked 426 Times on 326 Posts
Likes Given: 660

Default

The power company doesn't like customers messing with the meter. Makes them get suspicious. Just be careful and you'll be fine. Course as an electrician...that's easy for me to say.

__________________
Hammy71 is offline
gtmaus Likes This 
Reply With Quote Quick reply to this message
Old 01-28-2013, 09:02 PM   #3
mbauer013
Feedback Score: 0 reviews
Recipes 
 
Join Date: Apr 2009
Location: Minneapolis, MN
Posts: 279
Liked 25 Times on 23 Posts
Likes Given: 41

Default

I've done it for remodel and my brewing setup - not a big deal really, especially for installing a breaker, you are never going to be touching the big leads and if you shut off the main power, even that isn't a concern (I guess depending upon your panel age and design) My breakers snap right in, connect the ground to ground bus and nuetral to nuetral bus and connect the leads to the breaker. 10-minute job really.

__________________
mbauer013 is offline
 
Reply With Quote Quick reply to this message
Old 01-28-2013, 09:02 PM   #4
kevreh
Feedback Score: 0 reviews
Recipes 
 
Join Date: Sep 2012
Location: Annandale, VA
Posts: 225
Liked 12 Times on 10 Posts
Likes Given: 11

Default

Yeah, I was just reading on how controversial it is to pull power at the meter, plus I guess every state is different.

Related question- the main circuit breaker turns off all the branch circuits below it, at least in my panel. About it are more breakers, mostly 240. Why does the "main" circuit breaker only cut power to the circuits below it, versus, say, all the circuits? I guess that was phased out?

__________________
On tap: Summer Ale, Vienna Lager/Ale
In the fermenter: 59 Minute IPA
On deck: Two Hearted IPA

My eBrewery
kevreh is offline
 
Reply With Quote Quick reply to this message
Old 01-28-2013, 09:06 PM   #5
Hammy71
Senior Member
HBT_SUPPORTER.png
Feedback Score: 0 reviews
 
Hammy71's Avatar
Recipes 
 
Join Date: Sep 2008
Location: , Maryland, The Tax Me State
Posts: 5,665
Liked 426 Times on 326 Posts
Likes Given: 660

Default

Do you have a disconnect outside? Weird that the main is in the middle. Only time I've seen that is in the older Square D panels with the split bus. My parents had one of the those...hated it. Like I said earlier....be careful.

__________________
Hammy71 is offline
 
Reply With Quote Quick reply to this message
Old 01-28-2013, 09:13 PM   #6
kevreh
Feedback Score: 0 reviews
Recipes 
 
Join Date: Sep 2012
Location: Annandale, VA
Posts: 225
Liked 12 Times on 10 Posts
Likes Given: 11

Default

Its a GE Panel from the 60's.

__________________
On tap: Summer Ale, Vienna Lager/Ale
In the fermenter: 59 Minute IPA
On deck: Two Hearted IPA

My eBrewery
kevreh is offline
 
Reply With Quote Quick reply to this message
Old 01-28-2013, 09:25 PM   #7
Poobah58
HBT_LIFETIMESUPPORTER.png
Feedback Score: 1 reviews
 
Poobah58's Avatar
Recipes 
 
Join Date: Jun 2007
Location: New Milford, CT
Posts: 2,249
Liked 57 Times on 50 Posts
Likes Given: 25

Default

If you have to ask those kinds of questions... GET AN ELECTRICIAN!!!

__________________
Mead Lane Brewing
The liver is evil and must be punished
Poobah58 is offline
5
People Like This 
Reply With Quote Quick reply to this message
Old 01-31-2013, 03:22 AM   #8
cfrazier77
Senior Member
HBT_LIFETIMESUPPORTER.png
Feedback Score: 0 reviews
 
cfrazier77's Avatar
Recipes 
 
Join Date: Mar 2011
Location: Troy, IL
Posts: 617
Liked 79 Times on 54 Posts
Likes Given: 70

Default

I have worked on my panel before. As long as you pull the mains you are good. If you are concerned you can check that the power is dead with a multimeter.

You really don't want to do anything outside. I was a firefighter for many years and we pulled the meters on all house fires. We always wore heavy gloves and hit it off. Sometimes there was quite a bit of sparks.

__________________
cfrazier77 is offline
 
Reply With Quote Quick reply to this message
Old 01-31-2013, 03:31 AM   #9
thadius856
HBT_LIFETIMESUPPORTER.png
Feedback Score: 0 reviews
 
thadius856's Avatar
Recipes 
 
Join Date: Dec 2012
Location: Marysville
Posts: 2,272
Liked 601 Times on 250 Posts
Likes Given: 155

Default

Jesus Christ. Don't listen to some these posts, OP. That's a recipe for disaster.

If you kill the main service disconnect, the lugs coming from the PoCo's side of the panel are still hot and carrying the full 240V @ 200A, or whatever your service is. If you don't know what this means, then really, you need to study up a lot more before attempting or hire it out.

Quote:
Originally Posted by kevreh View Post
Yeah, I was just reading on how controversial it is to pull power at the meter, plus I guess every state is different.

Related question- the main circuit breaker turns off all the branch circuits below it, at least in my panel. About it are more breakers, mostly 240. Why does the "main" circuit breaker only cut power to the circuits below it, versus, say, all the circuits? I guess that was phased out?
The main service disconnect kills everything downstream from it, which is... everything. If yours doesn't, then you likely have a serious code violation on your hands.

Quote:
Originally Posted by mbauer013 View Post
I've done it for remodel and my brewing setup - not a big deal really, especially for installing a breaker, you are never going to be touching the big leads and if you shut off the main power, even that isn't a concern (I guess depending upon your panel age and design) My breakers snap right in, connect the ground to ground bus and nuetral to nuetral bus and connect the leads to the breaker. 10-minute job really.
The "big leads" will kill you if you touch them, even if you shut off your service disconnect. If you want those to be de-energized, then you either need to have a pull disconnect upstream from the meter (unlikely) or have the PoCo pull the meter. My PoCo won't put the meter back in without the city inspector's tag, signature and date taped to panel. If your PoCo is anal, you could very well end up in the dark for weeks while you traverse the permitting process, then get an inspection.

If you want to do this yourself, please permit it. We just had a house fire this past year because I failed to find some unpermitted and faulty electrical work (burried under a foot of attic insulation).

Edit: Perhaps this will help show the seriousness of this. Here's pictures of what it looked like the morning after the fire department gutted the attic above my living room. I'm extremely lucky I didn't lose the whole house and nobody died.













Total cost was about $45,000 and counting.
__________________
Was this post helpful? Don't forget to click 'Like'!

Thadius Miller, Project Manager -> RaspberryPints

Before you build a keezer, look at this!
Chest Freezer Spec Sheets and Layout Drawings (15 models and counting)
thadius856 is offline
gregm61881 Likes This 
Reply With Quote Quick reply to this message
Old 01-31-2013, 04:18 AM   #10
kevreh
Feedback Score: 0 reviews
Recipes 
 
Join Date: Sep 2012
Location: Annandale, VA
Posts: 225
Liked 12 Times on 10 Posts
Likes Given: 11

Default

Damn, sorry to hear that. What was the cause? Wrong gauge wiring?

__________________
On tap: Summer Ale, Vienna Lager/Ale
In the fermenter: 59 Minute IPA
On deck: Two Hearted IPA

My eBrewery
kevreh is offline
 
Reply With Quote Quick reply to this message
Reply



Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Main power wire gauge for 50A panel summerofgeorge Electric Brewing 17 06-14-2012 12:38 PM
What guage wire from main panel to spa panel? AdamCanFly Electric Brewing 22 02-01-2012 03:36 AM
Opinion on routing control panel electrical/sensor wires jcaudill Brew Stands 4 06-28-2011 12:33 PM
Control panel main power switch...what are you using? Ranger9913 Brew Stands 6 03-12-2010 05:20 PM
Electrical Help with Control Panel for Electric Kettle TheAleMaster Brew Stands 19 02-15-2010 03:42 AM



Newest Threads

LATEST SPONSOR DEALS