Spike Brewing 12.5 Conical Fermenter Giveaway - Enter Now!

Home Brew Forums > Home Brewing Beer > Electric Brewing > Power Lead question

Reply
 
LinkBack Thread Tools
Old 02-17-2012, 11:50 PM   #1
Airplanedoc
HBT_SUPPORTER.png
Feedback Score: 1 reviews
 
Airplanedoc's Avatar
Recipes 
 
Join Date: Sep 2011
Location: Illinois, and people thought Detroit was bad
Posts: 1,731
Liked 279 Times on 207 Posts
Likes Given: 76

Default Power Lead question

Rummaging thru my garage I stumbled on 50' of 8/3 with ground that I forgot I had. I'm doing a ekeggle with a 5500W coil + associated lights/controller Etc.. Looking downsized version of electricbrewery.

8/3 with Ground should be sufficient for my power lead and wiring from controller to keggle right?

__________________
Airplanedoc is offline
 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Quick Power Cord Question Thundercougarfalconbird Electric Brewing 14 02-08-2012 06:42 PM
Power Cord Question McCuckerson Electric Brewing 7 08-20-2011 09:54 PM
120V power demand design question G-Lover Electric Brewing 11 03-01-2011 08:32 PM
power switch question doulovebeef Electric Brewing 6 01-06-2011 01:32 AM
Power "In" Question... wottaguy Electric Brewing 6 12-07-2010 05:24 PM