Happy HolidaySs Giveaway - Winners Re-Re-Drawn - 24 hours to Claim!

Get your HBT Growlers, Shirts and Membership before the Rush!


Home Brew Forums > Home Brewing Beer > Electric Brewing > Pid Wiring Question...
Reply
 
LinkBack Thread Tools
Old 10-31-2010, 02:43 PM   #1
Dgonza9
Feedback Score: 0 reviews
Recipes 
 
Join Date: May 2010
Location: Evanston, Illinois
Posts: 1,183
Liked 10 Times on 10 Posts

Default Pid Wiring Question...

I have read a number of threads on PID wiring but I remain confused on one thing, where should I put a switch? Basically, I want to be able to confirm that the element is not firing when I don't have the pump running, but still leave the PID on to monitor temps when I want to.

So does a switch go between the SSR and the element or between the PID and the SSR to achieve this purpose?

Thanks.

__________________
On Tap: Belgian Barrel Aged Barleywine, Da Yooper's Oatmeal Stout, Breakfast Stout, Hop Your Face Off IIPA, Catcher in the Rye Saison, "Wino-head" Nelsin Sauvin Gumballhead.

Bourbon Barrel Duchesse De Bourgnone
Kegged:

Fermenting English Mild

on Deck: Lager?
Dgonza9 is offline
 
Reply With Quote Quick reply to this message
Old 10-31-2010, 03:50 PM   #2
snail
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jul 2008
Posts: 323
Liked 13 Times on 5 Posts

Default

I would put the switch between the PID and SSR so you aren't switching the SSR for nothing. The PID would send a signal to the SSR but it wouldn't get to it until you flicked the switch on.

__________________
snail is offline
 
Reply With Quote Quick reply to this message
Old 10-31-2010, 04:08 PM   #3
Dgonza9
Feedback Score: 0 reviews
Recipes 
 
Join Date: May 2010
Location: Evanston, Illinois
Posts: 1,183
Liked 10 Times on 10 Posts

Default

Yeah, that makes sense. Thanks for the input.

__________________
On Tap: Belgian Barrel Aged Barleywine, Da Yooper's Oatmeal Stout, Breakfast Stout, Hop Your Face Off IIPA, Catcher in the Rye Saison, "Wino-head" Nelsin Sauvin Gumballhead.

Bourbon Barrel Duchesse De Bourgnone
Kegged:

Fermenting English Mild

on Deck: Lager?
Dgonza9 is offline
 
Reply With Quote Quick reply to this message
Old 10-31-2010, 04:25 PM   #4
jkarp
Beer Herder
HBT_SUPPORTER.png
Feedback Score: 0 reviews
 
jkarp's Avatar
Recipes 
 
Join Date: Jun 2008
Location: Elizabeth, CO
Posts: 2,105
Liked 34 Times on 29 Posts
Likes Given: 4

Default

And for an opposing opinion...

Physical switch on the element, not the SSR. When an SSR fails, it normally fails closed, meaning it will pass current regardless of PID input. Physical switch should always trump any electronics.

__________________
jkarp is offline
 
Reply With Quote Quick reply to this message
Old 10-31-2010, 04:37 PM   #5
SweetSounds
Feedback Score: 1 reviews
Recipes 
 
Join Date: Jan 2010
Location: Des Moines, Iowa
Posts: 1,429
Liked 19 Times on 18 Posts
Likes Given: 4

Default

Both!

The switch on the PID side of the SSR is the easiest way to control when the element can fire. But SSRs can fail closed, so I prefer to also have a contactor between the SSR and the element. Just for safety.

__________________
Quote:
Originally Posted by Ecnerwal View Post
What does the primary pressure gauge on the tank tell us? That's right, the temperature. Put it on a scale if you want to know how much is in it...
Put some duct tape over the gauge - Or better yet - Replace the high pressure gauge with a plug - High pressure gauges are useless!
SweetSounds is offline
 
Reply With Quote Quick reply to this message
Old 10-31-2010, 05:29 PM   #6
snail
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jul 2008
Posts: 323
Liked 13 Times on 5 Posts

Default

Sweetsounds,

I'm confused how if the SSR fails closed it would still power the element if there was a switch between the PID and the SSR. Doesn't the SSR need the PID to tell it when to power the element? I'm confused

__________________
snail is offline
 
Reply With Quote Quick reply to this message
Old 10-31-2010, 05:36 PM   #7
SweetSounds
Feedback Score: 1 reviews
Recipes 
 
Join Date: Jan 2010
Location: Des Moines, Iowa
Posts: 1,429
Liked 19 Times on 18 Posts
Likes Given: 4

Default

The SSR is literally a solid state switch. The "Lever" is the low voltage signal from the PID that tells the SSR to "Close" - Conducting the current to the element.

But SSRs can fail. And when they do, they can fail in the "On" position, if you will.

It may never matter. But I don't like even the possibility that there is current going to something I think is off, when I stick my hand in there...

__________________
Quote:
Originally Posted by Ecnerwal View Post
What does the primary pressure gauge on the tank tell us? That's right, the temperature. Put it on a scale if you want to know how much is in it...
Put some duct tape over the gauge - Or better yet - Replace the high pressure gauge with a plug - High pressure gauges are useless!
SweetSounds is offline
 
Reply With Quote Quick reply to this message
Old 10-31-2010, 05:38 PM   #8
Dgonza9
Feedback Score: 0 reviews
Recipes 
 
Join Date: May 2010
Location: Evanston, Illinois
Posts: 1,183
Liked 10 Times on 10 Posts

Default

Does the SSR receive power thru the PID as a pass through or does it merely receive a signal to switch power on?

I believe it's the latter. This would mean that the SSR can turn on your element without the PID, correct?

__________________
On Tap: Belgian Barrel Aged Barleywine, Da Yooper's Oatmeal Stout, Breakfast Stout, Hop Your Face Off IIPA, Catcher in the Rye Saison, "Wino-head" Nelsin Sauvin Gumballhead.

Bourbon Barrel Duchesse De Bourgnone
Kegged:

Fermenting English Mild

on Deck: Lager?
Dgonza9 is offline
 
Reply With Quote Quick reply to this message
Old 11-01-2010, 12:43 AM   #9
jkarp
Beer Herder
HBT_SUPPORTER.png
Feedback Score: 0 reviews
 
jkarp's Avatar
Recipes 
 
Join Date: Jun 2008
Location: Elizabeth, CO
Posts: 2,105
Liked 34 Times on 29 Posts
Likes Given: 4

Default

Quote:
Originally Posted by Dgonza9 View Post
Does the SSR receive power thru the PID as a pass through or does it merely receive a signal to switch power on?
Both. There are 4 screws. 2 provide the low-voltage signal and 2 are the switched high voltage "hot" leg. More often than not, when an SSR fails, it will continue to pass the high voltage regardless of input from the PID. This is why you want a mechanical switch after the SSR and before the element.
__________________
jkarp is offline
 
Reply With Quote Quick reply to this message
Old 11-01-2010, 01:00 AM   #10
stevehaun
HBT_LIFETIMESUPPORTER.png
Feedback Score: 0 reviews
Recipes 
 
Join Date: Dec 2006
Location: hudson, wi
Posts: 574
Liked 15 Times on 15 Posts
Likes Given: 26

Default

You really could put the contactor before or after the SSR. What matters is that you have a mechanical off to the element.

__________________
stevehaun is offline
 
Reply With Quote Quick reply to this message
Reply



Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Heatstick of doom! Start with wiring Qs. nostalgia Electric Brewing 40 01-17-2012 12:49 AM
Need help wiring 3 Position selector switch for Brewtroller EuBrew Electric Brewing 5 10-29-2010 05:39 PM
GFCI wiring? ExHempKnight Electric Brewing 5 10-23-2010 09:53 PM
Multiple GFCI wiring question Cpt_Kirks Electric Brewing 8 10-20-2010 04:22 PM
Wiring diagram advice frank551 Electric Brewing 6 10-19-2010 02:56 PM



Newest Threads

LATEST SPONSOR DEALS