Home Brew Forums > Home Brewing Beer > Electric Brewing > New E-Build - Service Panel Question
Reply
 
LinkBack Thread Tools
Old 12-04-2012, 03:25 PM   #11
ajdelange
HBT_LIFETIMESUPPORTER.png
Feedback Score: 0 reviews
Recipes 
 
Join Date: Aug 2010
Location: McLean/Ogden, Virginia/Quebec
Posts: 6,832
Liked 762 Times on 627 Posts
Likes Given: 21

Default

Quote:
Originally Posted by garbageman View Post
...had read the threads how you can convert to add 4 wires out of your spa disconnect on a 3 prong outlet. But it just didn't seem right.
It isn't. You made the right decision.

There is a workaround for 3 wire if you will only have modest 120V loading (controls, pumps) requirement but 4-wire is best and cheapest if you can pull the wire without having to tear your house apart.
__________________
ajdelange is offline
 
Reply With Quote Quick reply to this message
Old 12-04-2012, 05:16 PM   #12
crazyirishman34
HBT_LIFETIMESUPPORTER.png
Feedback Score: 49 reviews
 
crazyirishman34's Avatar
Recipes 
 
Join Date: Aug 2010
Location: Newton, MA
Posts: 1,566
Liked 58 Times on 54 Posts
Likes Given: 88

Default

I agree with the last 2 post. If you shop around you should be able to find an electrician that will do the work in the panel for you.

__________________
crazyirishman34 is offline
 
Reply With Quote Quick reply to this message
Old 12-05-2012, 01:46 AM   #13
grandequeso
Feedback Score: 0 reviews
Recipes 
 
Join Date: Aug 2012
Location: jacksonville, fl
Posts: 184
Liked 10 Times on 10 Posts
Likes Given: 7

Default

I love those fed pacific panels. They keep me steadily employed. Google search "federal pacific panel" is all I tell my customers. I suggest you don't spend any money on that panel. Just get it changed. negotiate having a brew circuit installed at the same time. Most home insurance companies will drop your coverages if they find you have one of those fireboxes in your casa.

__________________
grandequeso is offline
 
Reply With Quote Quick reply to this message
Old 12-05-2012, 04:34 AM   #14
whoaru99
Feedback Score: 0 reviews
Recipes 
 
Join Date: Oct 2012
Posts: 1,611
Liked 126 Times on 103 Posts
Likes Given: 16

Default

Quote:
Originally Posted by chadillac7819 View Post
that seemed like the easiest option...connect the spa panel directly where the water heater was asn then run wire from the panel in flex tube to my brweery about 15 feet away.

any changes at the box and i would need to call my electrician.
I don't know about your water heaters, but mine have all been 240V only, meaning two hots and ground, whereas most brew setups seem to be geared to 120/240V that use a neutral (and decidedly preferable with dedicated equipment grounding, meaning 4-wire circuit).
__________________

Drinking: Russian Imperial Stout
Drinking: Pre-prohibition Lager
In-process: Another batch of Pre-prohibition Lager
Next up: Scottish Wee Heavy

whoaru99 is offline
 
Reply With Quote Quick reply to this message
Reply



Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Using A Retired Service Panel For A Control Panel kgalle Electric Brewing 2 04-25-2012 12:52 PM
Control Panel Build sdugre Electric Brewing 9 10-14-2011 06:47 AM
Service panel question. wildwest450 Brew Stands 8 06-13-2010 10:22 PM
Height for a service panel? wildwest450 Brew Stands 14 06-03-2010 06:18 PM
upgrading service panel tarheels Equipment/Sanitation 25 01-09-2009 11:46 PM



Newest Threads

LATEST SPONSOR DEALS