*Ss Brewing Technologies Giveaway - Enter Now!*

Home Brew Forums > Home Brewing Beer > Electric Brewing > My Electric Build...Finally....
Reply
 
LinkBack Thread Tools
Old 11-18-2010, 01:53 AM   #1
hammis
HBT_SUPPORTER.png
Feedback Score: 0 reviews
 
hammis's Avatar
Recipes 
 
Join Date: Mar 2010
Location: canada
Posts: 295
Liked 4 Times on 4 Posts
Likes Given: 2

Default My Electric Build...Finally....

Ok so i've been working on this build on and off since this past June. I've made some HUGE progress and think i am very close to the end (i hope). I would love to be able to brew in early december and possibly have something ready for Christmas/New Years.

I started out with 3 old kegs from a guy i know (hooked me up bigtime = $0 paid). I cut open 2 and used a wire brush attachment on my drill to clean off all of the old stickers and paint.

__________________

Last edited by hammis; 12-16-2010 at 12:40 AM. Reason: spelling
hammis is offline
 
Reply With Quote Quick reply to this message
Old 11-18-2010, 01:58 AM   #2
hammis
HBT_SUPPORTER.png
Feedback Score: 0 reviews
 
hammis's Avatar
Recipes 
 
Join Date: Mar 2010
Location: canada
Posts: 295
Liked 4 Times on 4 Posts
Likes Given: 2

Default

I just drew out the diameter of the holes i wanted to cut in the top of each keg and cut them using my grinder and some nice cutoff disks (freehand). they turned out pretty well. I then used a cheap a$$ step drill bit from harbour freight to drill the holes for my valves (as can be seen on the first 2 kegs

237.jpg  
__________________

Last edited by hammis; 04-12-2011 at 04:33 PM. Reason: spelling...again...
hammis is offline
 
Reply With Quote Quick reply to this message
Old 11-18-2010, 02:02 AM   #3
hammis
HBT_SUPPORTER.png
Feedback Score: 0 reviews
 
hammis's Avatar
Recipes 
 
Join Date: Mar 2010
Location: canada
Posts: 295
Liked 4 Times on 4 Posts
Likes Given: 2

Default

before moving onto cutting open the 3rd keg and cleaning it up, i finished off my brew stand so i would have some space in my cramped basement to organize myself a little bit.

327.jpg  
__________________
hammis is offline
 
Reply With Quote Quick reply to this message
Old 11-18-2010, 02:10 AM   #4
hammis
HBT_SUPPORTER.png
Feedback Score: 0 reviews
 
hammis's Avatar
Recipes 
 
Join Date: Mar 2010
Location: canada
Posts: 295
Liked 4 Times on 4 Posts
Likes Given: 2

Default

I finished cutting open the 3rd keg and plumbing it with a valve. All valves are weldless.

Once this was completed i removed all the valves and took some barkeepers friend, a green scotch brite pad and a hose and scrubbed the kegs until they looked nice and shiney.

616.jpg   710.jpg  
__________________
hammis is offline
 
Reply With Quote Quick reply to this message
Old 11-18-2010, 02:14 AM   #5
hammis
HBT_SUPPORTER.png
Feedback Score: 0 reviews
 
hammis's Avatar
Recipes 
 
Join Date: Mar 2010
Location: canada
Posts: 295
Liked 4 Times on 4 Posts
Likes Given: 2

Default

At this point i was waiting for $$$ to accrue in my bank account again and i had a few parts on order so i decided it was time to work on my grain mill setup. I tried to keep it simple, due to the limited space i have in the basement. I bought a bucket and some veneered plywood from the local hardware store and used my jigsaw to cut everything out. I attached the 2 roller monster mill to the base with the nuts it came with and then built the hopper on top.

424.jpg   105.jpg   1113.jpg  
__________________
hammis is offline
 
Reply With Quote Quick reply to this message
Old 11-18-2010, 02:20 AM   #6
hammis
HBT_SUPPORTER.png
Feedback Score: 0 reviews
 
hammis's Avatar
Recipes 
 
Join Date: Mar 2010
Location: canada
Posts: 295
Liked 4 Times on 4 Posts
Likes Given: 2

Default

Again, I had some time to kill waiting for parts and $$$. So i decided to test out the heating element i had, 1440W with the normal electrical outlet located 5 feet away. I plumbed it the same way 95% of the guys on this website have done, i initially tried Kal's method and was really looking forwards to the way it looked, but i couldnt get a good enough seal, so i gave up and went the other simpler route.

Once the JB weld was dry i connected the element to the kettle, filled the kettle with about 5 gal of water and let it rip. It took about 70 min to raise the water from cold tap temperature to 70 deg Celcius (too long for me, so i swapped it out for a 4500W element instead. I havent tried it yet as i have to still complete my electrical panel (hopefully this weekend)

513.jpg  
__________________
hammis is offline
 
Reply With Quote Quick reply to this message
Old 11-18-2010, 02:27 AM   #7
hammis
HBT_SUPPORTER.png
Feedback Score: 0 reviews
 
hammis's Avatar
Recipes 
 
Join Date: Mar 2010
Location: canada
Posts: 295
Liked 4 Times on 4 Posts
Likes Given: 2

Default

So once some parts arrived and i made a trip to princess auto and picked some stuff up (lights etc) i started work on my electrical panel. This was also after lengthy discussion on electrical safety and process with my electricians at work and a few of the guys on this forum. (thanks to all involved )

Please dont criticize the wiring yet, i havent finished nor cleaned it up (hopefully will get done this weekend)

1310.jpg   156.jpg   165.jpg   174.jpg   187.jpg  

__________________
hammis is offline
 
Reply With Quote Quick reply to this message
Old 11-18-2010, 02:29 AM   #8
hammis
HBT_SUPPORTER.png
Feedback Score: 0 reviews
 
hammis's Avatar
Recipes 
 
Join Date: Mar 2010
Location: canada
Posts: 295
Liked 4 Times on 4 Posts
Likes Given: 2

Default

Thats it for now, i do have some more stuff done i just dont have time to post it now, lol. I will try to update more tomorrow and hopefully LOTS more after this weekend.

Cheers!

__________________
hammis is offline
 
Reply With Quote Quick reply to this message
Old 11-18-2010, 02:29 AM   #9
klyph
Feedback Score: 0 reviews
Recipes 
 
Join Date: Dec 2009
Location: North Pole, Alaska
Posts: 1,809
Liked 38 Times on 34 Posts
Likes Given: 3

Default

I like the 2 tier, you could park a truck on that thing.

__________________
10 gallon electric system
Stovetop 110v single vessel 5 gallon system

Primary: saison
Secondary: nada
Conditioning: macaroon stout
Drinking: store bought
klyph is offline
 
Reply With Quote Quick reply to this message
Old 11-18-2010, 02:48 AM   #10
Ohio-Ed
HBT_LIFETIMESUPPORTER.png
Feedback Score: 0 reviews
 
Ohio-Ed's Avatar
Recipes 
 
Join Date: Nov 2008
Posts: 2,072
Liked 19 Times on 18 Posts

Default

Nice job!

__________________
Ohio-Ed is offline
 
Reply With Quote Quick reply to this message
Reply



Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Electric Question Ohio-Ed Electric Brewing 368 04-12-2014 03:25 PM
Electric brewery build nostalgia Electric Brewing 191 12-09-2013 07:04 PM
I want to make an electric MLT... Beavdowg Electric Brewing 9 09-14-2011 10:25 PM
Electric Brewstand JoeBuch Electric Brewing 24 01-18-2011 06:27 PM
electric brewery help RedBarnBrewing Electric Brewing 5 10-23-2010 02:28 AM