Get your HBT Growlers, Shirts and Membership before the Rush!


Home Brew Forums > Home Brewing Beer > Electric Brewing > Let the build begin... e-keggle starts NOW
Reply
 
LinkBack Thread Tools
Old 11-23-2013, 03:25 AM   #1
BigFloppy
Feedback Score: 8 reviews
Recipes 
 
Join Date: Aug 2013
Location: Marietta, GA
Posts: 471
Liked 33 Times on 25 Posts
Likes Given: 12

Default Let the build begin... e-keggle starts NOW

hardware:
18x13x6" aluminum case http://www.harborfreight.com/18-x-13...ase-69315.html
various switches / indicators

1x Rims Tube
1x Chugger
25ft x 1/2" silicon hose mcmaster 3038K26
1x HD mash tun
2x Auber 2532 PID controllers
1x Auber JSL-73A multi-timer
1x cheapie ebay pid for mash monitoring (ala Kal's system)
10g Bayou Classic boiler

5G Moose Drool to keep us going

__________________
BigFloppy is offline
 
Reply With Quote Quick reply to this message
Old 11-23-2013, 12:12 PM   #2
pannell77
Sponsor
HBT_SPONSOR.png
Vendor Ads 
Feedback Score: 2 reviews
 
pannell77's Avatar
Recipes 
 
Join Date: Apr 2012
Location: westerville, ohio
Posts: 743
Liked 34 Times on 30 Posts
Likes Given: 18

Default

good luck, post pics

__________________
Looking for quality Chalkboard or Dry Erase Tap Handles at an affordable price?

Handmade Chalkboard and Dry Erase Tap Handles

We are one of the few that offer a Black Dry Erase version tap handle and we have some of the lowest prices on the market.

Custom Idea? No problem, just shoot us an email with your thoughts and we can work it out together.

AleYeahDesign@gmail.com



My Keezer Build
pannell77 is online now
 
Reply With Quote Quick reply to this message
Old 11-23-2013, 12:50 PM   #3
Call_Me_Tex
In over his head.
HBT_SUPPORTER.png
Feedback Score: 1 reviews
Recipes 
 
Join Date: Apr 2013
Location: Houston, Texas
Posts: 44
Liked 3 Times on 3 Posts
Likes Given: 12

Default

If you haven't already bought the ebay PID I think you'd be better off with a phase angle SSR to control your boil with a manual knob. Use the two Auberin units for your MLT and HLT.

That's my plan except I'm going to use a BCS-460 instead of multiple PIDs

__________________
Call_Me_Tex is offline
 
Reply With Quote Quick reply to this message
Old 12-02-2013, 02:27 PM   #4
BigFloppy
Feedback Score: 8 reviews
Recipes 
 
Join Date: Aug 2013
Location: Marietta, GA
Posts: 471
Liked 33 Times on 25 Posts
Likes Given: 12

Default Necessity is the mother of invention

I couldn't source the crimp forks for installing into the Auber PID cheaply BUT I did have some other forks available that were just a little too big to fit as a real fork.

SO...



and here's what they look like once installed

__________________
BigFloppy is offline
 
Reply With Quote Quick reply to this message
Old 12-02-2013, 02:46 PM   #5
AnOldUR
fer-men-TAY-shuhn
HBT_LIFETIMESUPPORTER.png
Feedback Score: 0 reviews
 
AnOldUR's Avatar
Recipes 
 
Join Date: Mar 2007
Location: New Jersey
Posts: 6,409
Liked 653 Times on 473 Posts
Likes Given: 486

Default

Personally, I'd try to find the right connector, but if you put them on the other side, they'll pull in instead of pushing out.

__________________
Personal taste is one thing, but to be arrogant about yours is what makes you an a-hole. Don't be an a-hole with personal taste.
. . .This has been a PSA from your local Klubb.

Billy-Klubb
AnOldUR is offline
NervousDad Likes This 
Reply With Quote Quick reply to this message
Old 12-02-2013, 02:50 PM   #6
BigFloppy
Feedback Score: 8 reviews
Recipes 
 
Join Date: Aug 2013
Location: Marietta, GA
Posts: 471
Liked 33 Times on 25 Posts
Likes Given: 12

Default

Quote:
Originally Posted by AnOldUR View Post
Personally, I'd try to find the right connector, but if you put them on the other side, they'll pull in instead of pushing out.
They don't pull or push, they are sandwiched between the moving plate and static bottom connector
__________________
BigFloppy is offline
 
Reply With Quote Quick reply to this message
Old 12-02-2013, 03:01 PM   #7
BigFloppy
Feedback Score: 8 reviews
Recipes 
 
Join Date: Aug 2013
Location: Marietta, GA
Posts: 471
Liked 33 Times on 25 Posts
Likes Given: 12

Default

Didn't have the nice U channel cable conduit BUT did have some Cable Tubing Conduit so I put it to use. It will be tied down using tie-wrap mounts and tie wraps.

Can you spot my major "oops" from this picture (the space is there for an additional needed PID, that's not the oops)?

__________________
BigFloppy is offline
 
Reply With Quote Quick reply to this message
Old 12-02-2013, 05:21 PM   #8
BigFloppy
Feedback Score: 8 reviews
Recipes 
 
Join Date: Aug 2013
Location: Marietta, GA
Posts: 471
Liked 33 Times on 25 Posts
Likes Given: 12

Default

At least I have my choice of styles of DIN connectors from previous DIY builds, I way over-bought on these but got them at the right price a couple of years ago, now they will get the proper usage they demand. WAGO ROCKS

Just push a screwdriver into the Square hole and the round hole is where the cable goes, pull the screwdriver out and the cable is locked in place

__________________

Reason: description of usage
BigFloppy is offline
 
Reply With Quote Quick reply to this message
Old 12-02-2013, 05:37 PM   #9
BigFloppy
Feedback Score: 8 reviews
Recipes 
 
Join Date: Aug 2013
Location: Marietta, GA
Posts: 471
Liked 33 Times on 25 Posts
Likes Given: 12

Default Ferrules rock!

Because the DIN terminals I have are majority "push-fit" - Ferrules are definitely the way to go...
Strip the wire, put the copper strands through the hole in the ferrule and crimp away, much easier than trying to solder the wire to get an effective solid strand

__________________
BigFloppy is offline
 
Reply With Quote Quick reply to this message
Old 12-02-2013, 06:11 PM   #10
BigFloppy
Feedback Score: 8 reviews
Recipes 
 
Join Date: Aug 2013
Location: Marietta, GA
Posts: 471
Liked 33 Times on 25 Posts
Likes Given: 12

Default

What color goes where on 110V wiring?

USA Wiring:
Black = Live = Gold Colored connector
White = Neutral = silver connector
Green = Ground = Green Connector


AH, but my cable colors are Brown, Blue and Green/Yellow... now what?
Brown = Live
Blue = Neutral
Green = Ground

__________________
BigFloppy is offline
 
Reply With Quote Quick reply to this message
Reply



Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Fermentation chamber parts are in, build shall begin glavini Fermenters 10 06-22-2011 03:53 AM
I am ready to begin planning my brewstand build jawilson20 Brew Stands 2 05-02-2011 04:10 PM
my brew build starts! davefleck Brew Stands 1 08-01-2010 02:42 PM
Keggle Build Sbert420 Equipment/Sanitation 1 03-07-2009 05:14 PM



Newest Threads

LATEST SPONSOR DEALS