Hey All,

My electric brewery build.

Even before I start, thanks to everyone on this forum, from which I've found the answers to almost all of my questions.

My design philosophy is:
* I like to brew often -- so I'll stick with a 5 gallon capacity.
* I want it to be compact -- so it'll be mobile and store easily.
* Everything attached -- so stuff doesn't go missing between sessions.
* No lifting -- 2-tier with a pump.
* I want to brew indoors -- Electric.

Here is the system as it is in my imagination:

Thanks,
Kevin

brewery_5.jpg  
__________________
KevinWagner is offline
 
Reply With Quote Quick reply to this message
Old 01-06-2012, 02:58 PM   #2
KevinWagner
HBT_LIFETIMESUPPORTER.png
Feedback Score: 0 reviews
 
KevinWagner's Avatar
Recipes 
 
Join Date: Dec 2011
Location: Seattle, Washington
Posts: 38
Default Re: Kevin's E-Brewery Build

Hey All,

I've cut all the steel tube for the brew-stand.

1x1.5x0.065 steel tube from OnlineMetals, which happens to be local.

Using a HF 90A Flux-Core Welder #98871.

Haven't done any welding since high-school shop some 15+ years.

Ugly welds = lots of grinding!

Thanks,
Kevin

cutting_parts_img_0584.jpg   corner_weld_img_0589_small.jpg  
__________________
KevinWagner is offline
 
Reply With Quote Quick reply to this message
Old 01-06-2012, 04:23 PM   #3
gunmetal
Feedback Score: 1 reviews
Recipes 
 
Join Date: Apr 2010
Location: Ohio
Posts: 193
Liked 15 Times on 13 Posts

Default

I would bevel the steel where the 45 degree angles come together. It will give more room for the weld to fill in. That band saw probably makes really clean cuts where the metal fits perfectly. After grinding a weld there probably is not much weld left, hence bevel the joints. Actually those weld are not too bad for a flux core machine.

__________________
gunmetal is offline
 
Reply With Quote Quick reply to this message
Old 01-06-2012, 06:52 PM   #4
KevinWagner
HBT_LIFETIMESUPPORTER.png
Feedback Score: 0 reviews
 
KevinWagner's Avatar
Recipes 
 
Join Date: Dec 2011
Location: Seattle, Washington
Posts: 38
Default Re: Kevin's E-Brewery Build

Hey All,

Here is the frame all tacked-up, and test fitting the HLT and pump.

I think the placement of the control panel is going to interfere with connecting the hoses, and in being able to see the thermometer, on the HLT.

I am considering hanging it off to the left side of the brew-stand.

Biggest challenge I've had with welding has been with burning through the thin-walled tube.

Coming together nicely nevertheless!

Thanks,
Kevin

img_0609.jpg  
__________________
KevinWagner is offline
 
Reply With Quote Quick reply to this message
Old 01-06-2012, 08:56 PM   #5
KevinWagner
HBT_LIFETIMESUPPORTER.png
Feedback Score: 0 reviews
 
KevinWagner's Avatar
Recipes 
 
Join Date: Dec 2011
Location: Seattle, Washington
Posts: 38
Default Re: Kevin's E-Brewery Build

Quote:
Originally Posted by gunmetal View Post
I would bevel the steel where the 45 degree angles come together. It will give more room for the weld to fill in. That band saw probably makes really clean cuts where the metal fits perfectly. After grinding a weld there probably is not much weld left, hence bevel the joints. Actually those weld are not too bad for a flux core machine.
I still have loads of clean-up to do, and on the corners particularly. I wanted to round the corners, so they wouldn't be sharp -- and would have the same radius as the long edges of the ajacent tube -- and realized I was grinding the corner welds completely off! Thanks for the tip!

Thanks,
Kevin
__________________

Reason: Correct horrible spelling...
KevinWagner is offline
 
Reply With Quote Quick reply to this message
Old 01-06-2012, 09:03 PM   #6
mcaple1
Registered User
Feedback Score: 0 reviews
Recipes 
 
Join Date: Apr 2011
Location: Falcon, CO
Posts: 892
Liked 13 Times on 13 Posts

Default

sub'd

__________________
mcaple1 is offline
 
Reply With Quote Quick reply to this message
Old 01-06-2012, 09:39 PM   #7
Stankonia
Feedback Score: 0 reviews
Recipes 
 
Join Date: Mar 2011
Location: San Francisco, CA
Posts: 177
Liked 4 Times on 4 Posts

Default

Nice and compact...I'm going to follow this as I may be moving to San Fran this summer and at prices out there I know I will suddenly have a lot less room to brew.

Looks good so far!

__________________
Stankonia is offline
 
Reply With Quote Quick reply to this message
Old 01-06-2012, 11:55 PM   #8
Lucky_Chicken
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jul 2011
Location: Bloomfield, IA
Posts: 791
Liked 32 Times on 24 Posts
Likes Given: 4

Default

nice looking build!

I'll second the bevel the edges so the welds will work better.

Lucky_Chicken is offline
 
Reply With Quote Quick reply to this message
Old 01-07-2012, 05:20 AM   #9
gunmetal
Feedback Score: 1 reviews
Recipes 
 
Join Date: Apr 2010
Location: Ohio
Posts: 193
Liked 15 Times on 13 Posts

Default

Quote:
I still have loads of clean-up to do, and on the corners particularly. I wanted to round the corners, so they wouldn't be sharp -- and would have the same radius as the long edges of the ajacent tube -- and realized I was grinding the corner welds completely off! Thanks for the tip!
Thats the beauty of metal, if you make a mistake just grind it down and reweld it! I always say that wood is easier to cut and work with but metal is more foregiving.
__________________
gunmetal is offline
 
Reply With Quote Quick reply to this message
Old 01-07-2012, 08:47 PM   #10
KevinWagner
HBT_LIFETIMESUPPORTER.png
Feedback Score: 0 reviews
 
KevinWagner's Avatar
Recipes 
 
Join Date: Dec 2011
Location: Seattle, Washington
Posts: 38
Default Re: Kevin's E-Brewery Build

Hey All,

I'm debating the best place for the control panel.

I originally planned to put the 12x12x6 PVC box in front of the HLT. Looks like it would interfere with connecting hoses and reading the thermometer on the HLT.

I like the idea of having it on the front, because that keeps the cart compact, and having it on the left increases the overall length.

Having it on the left, on the other hand, makes the HLT more accessible. It will also allow me to tilt the panel back more, making the face of it more perpendicular to a user's line of sight.

Thanks,
Kevin

brewery_5_control_compare.jpg  
__________________
KevinWagner is offline
 
Reply With Quote Quick reply to this message
Reply



Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Hoppo's E-Brewery Build Hoppopotomus Electric Brewing 365 08-22-2014 09:45 PM
Electric brewery build nostalgia Electric Brewing 191 12-09-2013 07:04 PM
NattyBrew's Electric Brewery Build NattyBrew Electric Brewing 291 09-25-2012 03:16 PM
Another E-Brewery Build BigJim_inFLA Electric Brewing 47 08-05-2012 10:57 PM
Three E's Electric Brewery Build EuBrew Electric Brewing 54 01-08-2011 07:11 AM