Default Input on design

I'm looking for some input on my design. What I'm doing is a spin off of the 2 element design using 2, 20 Amp circuits. My idea is basically the same except I have 4 elements wired, with a selector switch to switch between two different elements on each circuit. That way, I can have one vessel with two elements or two vessels with one element running, depending on my needs.

I am not using a PID for the boil vessel, this will be run at full power, with the ability to switch one or two elements off, basically 2000 or 4000 watts. I will be using the boil vessel to heat water which will run through a coil for the mash, the mash temperature will then be controlled by turning a pump on/off directly from a PID.

The Acc switches and outlets are just for optional pumps, stirrers, exhaust vent, whatever that may come down the line. They may be added initially or as needed later.

Also, since the GFI is at the outlet, I kept the neutrals separate for each circuit, I think this is a requirement in order for GFI to work properly (this is why I have neutral 1 and 2 busses).

One last note on the drawing...the colored circles that are not labeled are 120V indicator lights.

So, that's what I THINK I have anyway. I'd like any input on the design before I start buying a bunch of components. Thanks.

panel2.jpg  
__________________
machfive55 is offline
 
Reply With Quote Quick reply to this message
Old 01-14-2013, 07:21 PM   #2
machfive55
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jul 2009
Location: Lancaster, PA
Posts: 125
Liked 9 Times on 9 Posts

Default

Better image:

__________________
machfive55 is offline
 
Reply With Quote Quick reply to this message
Old 01-18-2013, 03:03 PM   #3
machfive55
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jul 2009
Location: Lancaster, PA
Posts: 125
Liked 9 Times on 9 Posts

Default

No takers?

__________________
machfive55 is offline
 
Reply With Quote Quick reply to this message
Old 01-18-2013, 03:35 PM   #4
beluedog
Feedback Score: 0 reviews
Recipes 
 
Join Date: Dec 2012
Posts: 73
Liked 6 Times on 6 Posts
Likes Given: 7

Default

you need a neutral on your DPST main power relay control. Also 2000W @ 120 is 16.6 Amps not sure how much accessory power you will need/have additional. Explain what you are trying to do controlling the pump with the PID as well?

__________________
beluedog is offline
 
Reply With Quote Quick reply to this message
Old 01-18-2013, 05:35 PM   #5
machfive55
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jul 2009
Location: Lancaster, PA
Posts: 125
Liked 9 Times on 9 Posts

Default

Awesome, thanks. Thanks for the catch.

The accessory power is to run an exhaust fan or stirrer. I just put the hooks in for adding them later, they probably won't be wired up initially.

The PID controlled pump is pumping boiling water through a coil in the mash. When the mash needs heat the pump will switch on. It will allow maintaining mash temp and also step mashing. There was a write up in BYO about a setup just like this. It's a little different than RIMS or HERMS as hot water is being pumped rather than wort.

__________________
machfive55 is offline
 
Reply With Quote Quick reply to this message
Old 01-18-2013, 11:19 PM   #6
aquenne
Feedback Score: 0 reviews
Recipes 
 
Join Date: Oct 2011
Location: Paris, Ontario
Posts: 226
Liked 5 Times on 5 Posts
Likes Given: 6

Default

Any reason why your going that route? You will need to stir the mlt to avoid stratification plus the job of scooping grains out from around the coils.


I do like the innovative use of the two 20 a circuits with 4 elements

__________________
aquenne is offline
 
Reply With Quote Quick reply to this message
Old 01-19-2013, 03:02 AM   #7
machfive55
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jul 2009
Location: Lancaster, PA
Posts: 125
Liked 9 Times on 9 Posts

Default

There are pluses and minuses to any method. I don't like the idea of pumping my mash around, plus I mash in a cooler which is fairly temp stable, so I just need minor temp corrections, plus if I ever decide to step mash I can go that route too. I saw it in BYO and I thought it was a good idea.

__________________
machfive55 is offline
 
Reply With Quote Quick reply to this message
Old 01-19-2013, 01:53 PM   #8
ryane
Feedback Score: 0 reviews
Recipes 
 
Join Date: Nov 2008
Location: Washington
Posts: 780
Liked 5 Times on 5 Posts

Default

I think you could save yourself a bit of money by removing the relays in the diagram, they are redundant switches

get yourself a 20A 3-way switch, you can then use this to switch power between Boil 1/HLT 1 and Boil 2/HLT 2

Im thinking that you will need a relay between the Mash PID and the pump, but I could be wrong as it would depend the PID you use

As far as full on for boil, you might think of adding a router speed controller to one of the boil elements to be able to dial it back slightly, you can get one fairly cheaply and I think it could add a lot of extra ability to your design, and heck if you buy the router controller and nix the extra relays you might even come out ahead

http://www.grizzly.com/products/g3555

one last thing that occurred to me, you might want a way to turn off each of the heating circuits completely. Right now you always have to have power going to either the boil element, or one of the HLT SSR's, but there might be times when you dont want to have either one eg your boiling, only need 1 element, and do not want the HLT on anymore (not mashing, not sparging). In this case you wound either need a way to kill power to both, OR shut off the PID controlling the HLT and switch power to it instead

ryane is offline
 
Reply With Quote Quick reply to this message
Old 01-19-2013, 06:40 PM   #9
machfive55
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jul 2009
Location: Lancaster, PA
Posts: 125
Liked 9 Times on 9 Posts

Default

The selector switch is 3 way, so the middle position is off.

Also, I would like to eliminate the relays but was not aware there were 20 amp 3 position switches, at least in the 22mm component size. Maybe someone could point me there it would save some hassle and some space in the box.

__________________
machfive55 is offline
 
Reply With Quote Quick reply to this message
Old 01-19-2013, 07:41 PM   #10
ryane
Feedback Score: 0 reviews
Recipes 
 
Join Date: Nov 2008
Location: Washington
Posts: 780
Liked 5 Times on 5 Posts

Default

Quote:
Originally Posted by machfive55 View Post
The selector switch is 3 way, so the middle position is off.

Also, I would like to eliminate the relays but was not aware there were 20 amp 3 position switches, at least in the 22mm component size. Maybe someone could point me there it would save some hassle and some space in the box.
I dont know about 22mm rotary switches but there are toggles that will handle 20A that are 3 position

http://www.e-switch.com/product/tabi...s/default.aspx
http://compare.ebay.com/like/1406726...Types&var=sbar
__________________
RyanBrews - check out all the bread/funk/pickling/cheese and other crazy things I try...
ryane is offline
 
Reply With Quote Quick reply to this message
Reply



Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
New Bar in Design Phase, Input Welcome AMetcalf General Chit Chat 3 08-27-2012 02:13 AM
Input on AG System Design IncredibleMulk All Grain & Partial Mash Brewing 18 05-17-2012 06:56 PM
My Collapsible Stand Design- Need your input Zakit24 DIY Projects 5 05-11-2012 10:44 PM
Recipe Design Input for a Golden Raspberry mead. BootsyFlanootsy Mead Forum 4 12-24-2011 04:23 AM
MLT design Craigvu All Grain & Partial Mash Brewing 6 02-19-2010 04:01 AM