Default eHERMS 220v 50a Controller

Hello Gentlemen,

I've been lurking here for some time, planning on my eBrewery upgrade, I suppose it's time to leech a little more from this community.
I recently dropped a 4 pole 50A 220VAC into the garage in prep for the upcoming upgrade and I'm hoping to illicit the help of the very knowledgeable folks here, before I get started.

What I would like to achieve is a system that is capable of consecutive batches, but safe for clean up during boil. In otherwords, I want to be able to fire both elements at the same time. And be sure when they are not On so I can clean up.

I have an HLT HERMS, copper coil in the HTL, and a single pump with QD everywhere. I gravity to the BK, currently. The HLT and MT are both 15g keggle conversions. The BK is subject to change, but is currently just an 8 gal turkey fryer.

Here's what I'd like to do.
-Two elements 5500 and 4500.
-Auber PID for HLT control, with Alarm.
-Auber PID for BK control, with Alarm.
-I'll have a single pump, with room for an additional pump later.
-I would like to be able to switch off the power completely to either side of the rig, BK and HLT.
-I'd like an LED indicator that the power is on for each element and a separate indicator to show the element is active.


Please see my mark up design.


Any help with wiring diagrams and/or suggested components would be greatly welcome. (PJ?)


I will be documenting the build here.
Thanks to all.


---
It's Beer:30.

__________________
omayhemo is offline
 
Reply With Quote Quick reply to this message
Old 06-27-2012, 04:09 AM   #2
hatrickwah
Vendor
HBT_SPONSOR.png
Feedback Score: 1 reviews
 
hatrickwah's Avatar
Recipes 
 
Join Date: Nov 2010
Location: The Woodlands, TX
Posts: 263
Liked 6 Times on 5 Posts

Default

omayhemo,

Have you taken a look at this drawing I've put together. Its a good start for you. This is my standard 50a Kit. I know there are few tweaks left on the PID side, but I'll be fixing that tomorrow.

The drawing is close to what you sound like you would like. The only short is that I don't have a timer included, but as it sounds, you may be more interested in the Auber SWA-2441 which could easily be swapped in. Along with a buzzer (or 2) and switches for the alarms.

The panel design has led on power on side, e-stop on side, element control leds, as well as element active. The PIDs each have their own power switches.
Take a look. Of course, LEDs can easily be changed.

__________________

Keeping busy brewing & building.

Electric Brewing Supply

My e-Brewery | Keezer Build & Tap Tower Refurbish |Glycol System

hatrickwah is offline
cliffhanger1821 Likes This 
Reply With Quote Quick reply to this message
Old 06-27-2012, 11:49 AM   #3
P-J
HBT_LIFETIMESUPPORTER.png
Feedback Score: 0 reviews
Recipes 
 
Join Date: Mar 2010
Location: Charlotte, NC
Posts: 3,231
Liked 244 Times on 196 Posts
Likes Given: 430

Default

Here is a diagram that might help you:

As usual - click on the image for a full scale diagram printable on Tabloid Paper (11" x 17")



I sure hope this is of some help for you in your adventure.

P-J

__________________
P-J is online now
cliffhanger1821 Likes This 
Reply With Quote Quick reply to this message
Old 06-27-2012, 05:40 PM   #4
omayhemo
Feedback Score: 0 reviews
Recipes 
 
Join Date: May 2012
Location: Allen, TX
Posts: 27
Default

Thanks men. I appreciate your help.

__________________
omayhemo is offline
 
Reply With Quote Quick reply to this message
Old 06-27-2012, 06:39 PM   #5
omayhemo
Feedback Score: 0 reviews
Recipes 
 
Join Date: May 2012
Location: Allen, TX
Posts: 27
Default

PJ,
This is an SSR, correct?


I'm not sure I understand why the fast blow fuse is 1A instead of 12.5/13A. Isn't a fast blow supposed to be 1.25% of the protected component?

For the master switch, for example, would there be a down side I'm not considering to using:

http://www.auberins.com/index.php?ma...roducts_id=223
In place of the selector switch you illustrated? Seems I could avoid additional panel space for a power indicator if the switch itself is lit.

__________________

Last edited by omayhemo; 06-27-2012 at 09:08 PM.
omayhemo is offline
 
Reply With Quote Quick reply to this message
Old 06-27-2012, 09:57 PM   #6
P-J
HBT_LIFETIMESUPPORTER.png
Feedback Score: 0 reviews
Recipes 
 
Join Date: Mar 2010
Location: Charlotte, NC
Posts: 3,231
Liked 244 Times on 196 Posts
Likes Given: 430

Default

Quote:
Originally Posted by omayhemo View Post
PJ,
This is an SSR, correct?


I'm not sure I understand why the fast blow fuse is 1A instead of 12.5/13A. Isn't a fast blow supposed to be 1.25% of the protected component?

For the master switch, for example, would there be a down side I'm not considering to using:

http://www.auberins.com/index.php?ma...roducts_id=223
In place of the selector switch you illustrated? Seems I could avoid additional panel space for a power indicator if the switch itself is lit.
Yes that is a circuit depiction of a 40A SSR.

The 1A fuses are placed in circuits that have very low power requirements (Contactor, E-Stop & PID power) so that small gauge wiring can be put in place and the devices appropriately protected as well. If you want to use 12.5 or 15A fuses, feel free to do so. It's your build after all.

I did the diagram with selector switches as that was what you had illustrated in you panel layout drawing. You most certainly can use them for switches 5,6 & 7 as well but I feel they are not necessary as the PIDs will be lit when on. If you choose to change them it, then just requires wiring the illumination lights. BTW - there is no 'master' switch in the diagram that I drew.

Hope this makes sense.

P-J
__________________
P-J is online now
 
Reply With Quote Quick reply to this message
Old 06-27-2012, 10:51 PM   #7
omayhemo
Feedback Score: 0 reviews
Recipes 
 
Join Date: May 2012
Location: Allen, TX
Posts: 27
Default

Quote:
Originally Posted by P-J View Post
If you want to use 12.5 or 15A fuses, feel free to do so. It's your build after all.
No sir, I just want to understand the why.

Quote:
Originally Posted by P-J View Post
I feel they are not necessary as the PIDs will be lit when on.
I did not consider that.

Thanks to you both. I'll chew on this and do some more planning.
__________________

Last edited by omayhemo; 06-27-2012 at 10:53 PM.
omayhemo is offline
 
Reply With Quote Quick reply to this message
Old 06-28-2012, 12:23 PM   #8
omayhemo
Feedback Score: 0 reviews
Recipes 
 
Join Date: May 2012
Location: Allen, TX
Posts: 27
Default

Hey hatrickwah (Ryan right?),

What are the two contactors on the upper left for? Are those the master?

__________________
omayhemo is offline
 
Reply With Quote Quick reply to this message
Old 07-03-2012, 11:36 AM   #9
hatrickwah
Vendor
HBT_SPONSOR.png
Feedback Score: 1 reviews
 
hatrickwah's Avatar
Recipes 
 
Join Date: Nov 2010
Location: The Woodlands, TX
Posts: 263
Liked 6 Times on 5 Posts

Default

Quote:
Originally Posted by omayhemo
Hey hatrickwah (Ryan right?),

What are the two contactors on the upper left for? Are those the master?
Yep, yep.
Since each contactor is limited to 40a, I'm using 2 as a master switch. You could sub the 2 for one larger master, the problem is the cost is significantly higher.
__________________

Keeping busy brewing & building.

Electric Brewing Supply

My e-Brewery | Keezer Build & Tap Tower Refurbish |Glycol System

hatrickwah is offline
 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Eherms hlt how to? bagpiperjosh Electric Brewing 4 07-02-2013 03:29 PM
need help wiring eherms rig Lost Electric Brewing 2 06-28-2013 10:00 PM
Help With 220v Outlet larrynoz Electric Brewing 5 04-18-2012 09:28 PM
spliting 220v mike11b82 Electric Brewing 8 04-14-2011 03:15 PM
One 220v or two 110v? goybar Electric Brewing 5 10-12-2010 06:30 PM