Default eBrewery build

I just started planning an eBrewery build and I have some questions for the pros. First, the plan...
I want to run a 5500w 240v element in both the HLT and BK at the same time...in case I do back to back batches. I want to run 2 march pumps and a RIMS tube with 1500w element. I will have 3 PIDs controlling all of it. i have questions on the control panel wiring, but we'll cross that bridge later.
I will be doing 10 gallon batches at first but would like to step up to 15 or even 20G soon. Will a 5500w element be good to boil 18 or 19 gallons? How about boiling 25 gallons? or would I need to add an additional element?

I currently have a 30a 240v outlet in place (from an electric stove). That will be enough to run one of the elements but not both. Question is, can I run a second 30a 240v to feed the other element? Or would it be better to remove that and run a new 60a line there? It would be much easier (and cheaper) to add another 30a instead of running #6/3 and a new 60a GFCI breaker. Would having two separate 240v lines in the box be too confusing to get wired up?

Thanks in advance...more questions to follow

__________________
TheBiGZ is offline
 
Reply With Quote Quick reply to this message
Old 02-06-2013, 01:36 PM   #2
jeffmeh
HBT_SUPPORTER.png
Feedback Score: 0 reviews
 
jeffmeh's Avatar
Recipes 
 
Join Date: Feb 2009
Posts: 1,838
Liked 136 Times on 117 Posts
Likes Given: 18

Default

You can certainly design a control panel to take two 30a 240v input feeds. A 5500w element would be able to bring 25 gallons to a boil in a reasonably well insulated kettle, but it would take a couple of hours from "room temp," and I do not know whether it would maintain a good rolling boil once the lid was removed from the kettle.

One option would be to put two 5500w elements in both the HLT and the BK, and rig your panel to run either a) 1 element in each at the same time, OR b) both elements in one vessel, but NEVER c) both elements in both vessels.

__________________
jeffmeh is offline
 
Reply With Quote Quick reply to this message
Old 02-06-2013, 01:45 PM   #3
Chugmaster
Feedback Score: 0 reviews
Recipes 
 
Join Date: Sep 2012
Location: Ottawa, Ontario
Posts: 120
Default

Correct me if I'm wrong, but I believe that once you go past the 50a threshold, you've crossed out of the standard household wiring practices and your costs will escalate.

50a seems to be standard for new household electric ovens.

Remember, your HLT does not theoretically need as much power as your BK.

This formula is from another discussion board:

Gallons * Temp Rise (F)
------------------------------------ * 1000 = Watts Required
372 * heat up time (hours)

So, for a homebrew example of 7 gallons of wort at the beginning of your boil, and desiring to reach boil in 15 minutes, and assuming your wort temperature before boil is 150 degrees F after sparge runnoff:

7 * (212 - 150)
---------------------- * 1000 = X Watts
372 * .25 hours

Or 4666 watts.... or a 4500W element.

__________________
Chugmaster is offline
 
Reply With Quote Quick reply to this message
Old 02-06-2013, 01:58 PM   #4
TheBiGZ
HBT_SUPPORTER.png
Feedback Score: 0 reviews
Recipes 
 
Join Date: Sep 2010
Location: MD
Posts: 110
Liked 13 Times on 5 Posts
Likes Given: 2

Default

Quote:
Originally Posted by Chugmaster View Post
Correct me if I'm wrong, but I believe that once you go past the 50a threshold, you've crossed out of the standard household wiring practices and your costs will escalate.

50a seems to be standard for new household electric ovens.

Remember, your HLT does not theoretically need as much power as your BK.
I don't quite understand your first statement...what do you mean? We're talking $120 for 50' of 6/3 and $120 for 60a GFCI breaker. What other costs would there be?

Yes...in theory the HLT doesn't need as much power, however, it is bringing the temp up 100 degrees whereas the BK is only bringing it up about 50 degrees and then holding...but there is twice as much volume. So I think i'd still want to keep it a 5500w element in the HLT.
__________________
TheBiGZ is offline
sasky7777 Likes This 
Reply With Quote Quick reply to this message
Old 02-06-2013, 02:13 PM   #5
Chugmaster
Feedback Score: 0 reviews
Recipes 
 
Join Date: Sep 2012
Location: Ottawa, Ontario
Posts: 120
Default

Quote:
Originally Posted by TheBiGZ View Post
I don't quite understand your first statement...what do you mean? We're talking $120 for 50' of 6/3 and $120 for 60a GFCI breaker. What other costs would there be?
This would involve you hardwiring the system into your home, rather than simply being able to plug in a system.
__________________
Chugmaster is offline
 
Reply With Quote Quick reply to this message
Old 02-06-2013, 05:23 PM   #6
TheBiGZ
HBT_SUPPORTER.png
Feedback Score: 0 reviews
Recipes 
 
Join Date: Sep 2010
Location: MD
Posts: 110
Liked 13 Times on 5 Posts
Likes Given: 2

Default

Exactly. This will be a permanent addition. I am planning on mounting the control panel on the wall and run wires inside the walls to 30a twist lock receptacles in the appropriate location...HLT/BK to wall behind pots; pump and RIMS to underneath the table (120v for those obvi).
Here is a diagram of what I want.

bigzcontrolpanel.jpg  
__________________
TheBiGZ is offline
 
Reply With Quote Quick reply to this message
Old 02-07-2013, 12:04 PM   #7
TheBiGZ
HBT_SUPPORTER.png
Feedback Score: 0 reviews
Recipes 
 
Join Date: Sep 2010
Location: MD
Posts: 110
Liked 13 Times on 5 Posts
Likes Given: 2

Default

Can someone help me come up with a wiring diagram for this? Or have one already that would apply?
The only thing I haven't decided on yet is if I want to run another 240v 30a home run and use the existing circuit (probably pull a dedicated 20a circuit over too), or pull a whole new 60a circuit and just use that. The 60a stuff costs a lot more, so I'd kinda prefer to just pull a new 30a...plenty of room in my panel for either.

__________________
TheBiGZ is offline
 
Reply With Quote Quick reply to this message
Old 02-07-2013, 06:06 PM   #8
stevehaun
HBT_LIFETIMESUPPORTER.png
Feedback Score: 0 reviews
Recipes 
 
Join Date: Dec 2006
Location: hudson, wi
Posts: 564
Liked 13 Times on 13 Posts
Likes Given: 22

Default

50 amp breaker in your control panel wired to 50 amp spa panel with GFCI. Very cheap. I would recommend 5500 watts (5500/220=25 amps) in your BK and 4500 watts (4500/220=20.5amps) in your HLT. That way you can run them simultaneously and still have several amps left over to run pumps and PIDs. I think one 5500 watt element will boil 15 gallon batches. Anything bigger will be pushing it. I boil 35 gallon batches (43 gallons preboil) with two 4500 watt elements and I need to run at 90% power to get a decent boil. YMMV.

__________________
stevehaun is offline
 
Reply With Quote Quick reply to this message
Old 02-08-2013, 01:37 PM   #9
TheBiGZ
HBT_SUPPORTER.png
Feedback Score: 0 reviews
Recipes 
 
Join Date: Sep 2010
Location: MD
Posts: 110
Liked 13 Times on 5 Posts
Likes Given: 2

Default

That sounds good. I should be ok with 4500w in the HLT.

What is the general practice for extending the length of the RTD probe? What do I need to keep in mind when running wires to the XLR boxes? I know they work on resistance, so: What gauge wire? Do I need to keep all three legs the exact same length or is "close" good enough (does an inch or two difference matter)?

__________________
TheBiGZ is offline
 
Reply With Quote Quick reply to this message
Old 02-08-2013, 03:44 PM   #10
Xpertskir
Feedback Score: 6 reviews
Recipes 
 
Join Date: May 2012
Location: Morgantown, Wv
Posts: 2,037
Liked 390 Times on 252 Posts
Likes Given: 21

Default

Quote:
Originally Posted by stevehaun View Post
50 amp breaker in your control panel wired to 50 amp spa panel with GFCI..

About how much does this cost to get done? Im going to doing this in the fall.
__________________
Xpertskir is online now
 
Reply With Quote Quick reply to this message
Reply



Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
The Broken Robot eBrewery, oh me, oh my. Chriso Electric Brewing 57 10-16-2013 06:43 PM
Not your typical GFCI/ground for eBrewery question kaz4121 Electric Brewing 1 01-10-2013 12:35 AM
Went eBrewery. Looking at next steps. mavrick1903 Electric Brewing 1 10-29-2012 05:57 PM
bullfrog ale ebrewery build. captainoverspray Electric Brewing 14 10-05-2012 03:17 AM
KPR121's 220v HERMS eBrewery Build kpr121 Electric Brewing 69 06-14-2012 07:30 PM