Home Brew Forums > Home Brewing Beer > Electric Brewing > Control Panel PLANNING and BUILD




Reply
 
LinkBack Thread Tools Display Modes
Old 09-27-2012, 04:35 PM   #21
bdjohns1
Because beer is the only thing stopping me from mastering quantum physics..
Feedback Score: 0 reviews
Recipes 
 
Join Date: Dec 2011
Location: Sun Prairie, Wi
Posts: 313
Liked 33 Times on 33 Posts
Likes Given: 2

Default

Quote:
Originally Posted by P-J
A temp probe is not needed in the boil kettle. You change the PID mode to manual and then control the percent of power being delivered during the boil.
You don't need one for control, but unless you've got either a handheld or a regular thermometer mounted in your tank, it's nice to see the BK temperature when you're cooling, or if you're using the BK element to maintain CIP solution temperature.

File under non-essential, but convenient.


bdjohns1 is offline
 
Reply With Quote Quick reply to this message
Old 09-27-2012, 04:47 PM   #22
OneHoppyGuy
BrewSteel Brew Stands
HomeBrewTalk 2012 Vendor Giveaway Participate
Vendor Ads 
Feedback Score: 0 reviews
 
OneHoppyGuy's Avatar
Recipes 
 
Join Date: Nov 2009
Location: Concord, CA
Posts: 1,705
Liked 31 Times on 27 Posts
Likes Given: 49

Default

Unless you're not chilling in the Bk



__________________
Brewright. All Rights Reserved. We reserve the right to brew and to help you brew. To protect the brew and defend the brew. To make the brew and drink the brew.

BrewSteel.com
BrewSteel on Facebook
OneHoppyGuy is offline
 
Reply With Quote Quick reply to this message
Old 10-14-2012, 08:52 AM   #23
HDIr0n
Feedback Score: 0 reviews
Recipes 
 
Join Date: Oct 2010
Location: Texas
Posts: 347
Liked 15 Times on 14 Posts
Likes Given: 5

Default

Quote:
Originally Posted by OneHoppyGuy View Post
Unless you're not chilling in the Bk

That is very pretty DIN railing stuff, can you elaborate at all on it?

Thanks,
-G
__________________
My Brutus 20 build

My Brutus/1550 Failed build

“Fermentation may have been a greater discovery than fire."

– David Wallace
HDIr0n is online now
 
Reply With Quote Quick reply to this message
Old 10-14-2012, 03:56 PM   #24
OneHoppyGuy
BrewSteel Brew Stands
HomeBrewTalk 2012 Vendor Giveaway Participate
Vendor Ads 
Feedback Score: 0 reviews
 
OneHoppyGuy's Avatar
Recipes 
 
Join Date: Nov 2009
Location: Concord, CA
Posts: 1,705
Liked 31 Times on 27 Posts
Likes Given: 49

Default

Quote:
Originally Posted by HDIr0n View Post
That is very pretty DIN railing stuff, can you elaborate at all on it?

Thanks,
-G
The control panel is for this system

There are 4 KLD 3-way motorized ball valves, 3 March 815-PL-C pumps, ERIMS and Aeration system. A BCS 460 was used due to lack of availability of the 462. Thus there are more relays plus a rotary switch. The pumps are tied to 5 second time delay relays allowing the motorized ball valves time to open. The ERIMS has an inline magnetic flow switch to override the heater element to prevent dry firing. The system has manual override on burners, pumps and valves.
The kettles were supplied by Stout, the majority of the stainless hardware from BrewersHardware and the two 20 plate chillers are from DudaDiesel. The electrical equipment comes from AutomationDirect. The frame is 304 SS 2x2x.065. Burners are 23 jet natural gas supplied by BayouClassicDepot.
__________________
Brewright. All Rights Reserved. We reserve the right to brew and to help you brew. To protect the brew and defend the brew. To make the brew and drink the brew.

BrewSteel.com
BrewSteel on Facebook
OneHoppyGuy is offline
 
Reply With Quote Quick reply to this message
Old 10-14-2012, 04:33 PM   #25
Hickeybrew
Feedback Score: 0 reviews
Recipes 
 
Join Date: Oct 2012
Posts: 12
Default

Sub, Please keep us update on your project, I'm planning to build one soon


Hickeybrew is offline
 
Reply With Quote Quick reply to this message
Reply

Quick Reply
Message:
Options
Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
How to build a control panel (part 1) kal Electric Brewing 518 06-17-2013 09:20 PM
My 2 PID 2 SSR control panel build BSD_Glass Electric Brewing 7 04-06-2012 02:11 PM
Control panel Build Beeskneesbrew Electric Brewing 2 03-20-2012 10:33 PM
Control Panel Build sdugre Electric Brewing 9 10-14-2011 05:47 AM
Possible hire out of Control Panel Build IrregularPulse Electric Brewing 5 11-06-2010 02:53 PM



FOLLOW US ON