Ss Brewing Technologies Giveaway!

Home Brew Forums > Home Brewing Beer > Electric Brewing > Cascade St. Brewery up and running on E
Reply
 
LinkBack Thread Tools
Old 06-29-2011, 05:12 PM   #11
buffalobrewer
HBT_LIFETIMESUPPORTER.png
Feedback Score: 0 reviews
Recipes 
 
Join Date: Mar 2009
Location: Buffalo, NY
Posts: 994
Liked 18 Times on 16 Posts
Likes Given: 6

Default

Thanks for the picture. Hopefully i'll be finishing my stand over the 4th and was trying to figure out how to mount the controll panel.

Typically the outflow is up so any airbubbles will flow out and not cavitate and I think i've read that the pump works better restricted with the valve on the output side. But if it works, who cares, right?

__________________

You start with a full bag of luck and a empty bag of experience, your goal is to fill the bag of experience before you empty your bag of luck

buffalobrewer is offline
 
Reply With Quote Quick reply to this message
Old 06-30-2011, 03:03 AM   #12
stevehaun
HBT_LIFETIMESUPPORTER.png
Feedback Score: 0 reviews
Recipes 
 
Join Date: Dec 2006
Location: hudson, wi
Posts: 564
Liked 13 Times on 13 Posts
Likes Given: 22

Default

Nice Job!

__________________
stevehaun is offline
 
Reply With Quote Quick reply to this message
Old 07-03-2011, 05:14 AM   #13
EarthBound
Feedback Score: 0 reviews
Recipes 
 
Join Date: Mar 2010
Location: Beer Capital of the World
Posts: 984
Liked 10 Times on 9 Posts
Likes Given: 84

Default

Quote:
Originally Posted by acefaser View Post
The panel uses a single SSR with a computer fan cooled heat sink I found at a used computer store. No heat build up at all with that thing running!
It's cool to see someone else with a fan mounted on the heat sink. Here's a pic of mine.
__________________

"You can do anything you set your mind to when you have vision, determination, and an endless supply of beer."

EarthBound is offline
 
Reply With Quote Quick reply to this message
Reply



Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Running a sub panel with a full breaker box ChrisMichels Electric Brewing 7 05-12-2011 07:52 PM
Switch for running element at 120v OR 240V? thelorax121 Electric Brewing 14 05-10-2011 11:37 PM
Long Running Times for Pumps Douglefish Electric Brewing 5 03-24-2011 10:27 PM
up and running went well except... redman67 Electric Brewing 1 01-23-2011 11:07 PM
Running Elements in a series JVD_X Electric Brewing 2 10-13-2010 05:25 PM