Ss Brewing Technologies Giveaway!

Home Brew Forums > Home Brewing Beer > Electric Brewing > Building my Kal inspired control panel
Reply
 
LinkBack Thread Tools
Old 12-09-2012, 04:16 PM   #1
rangrr4834
Feedback Score: 0 reviews
Recipes 
 
Join Date: Aug 2012
Posts: 41
Liked 5 Times on 4 Posts

Default Building my Kal inspired control panel

I started working on my control panel recently and I thought I would post pics as I move forward. I have already learned much working on this.

I began to cut the holes for the front. I used different carbon drill bits and a drill press to make the starter holes. I have a friend that does electrical work and he is going to loan me his punch to make the 22mm round cutouts.

2012-11-29-21.29.10.jpg   2012-11-29-21.29.22.jpg  
__________________
rangrr4834 is offline
 
Reply With Quote Quick reply to this message
Old 12-09-2012, 04:21 PM   #2
rangrr4834
Feedback Score: 0 reviews
Recipes 
 
Join Date: Aug 2012
Posts: 41
Liked 5 Times on 4 Posts

Default

I then started the rectangular and square holes. I began with a Dremel and after breaking three mandrels, I decided to use a jigsaw and metal blade (as Kal already recommended) which worked much better!

I bought the enclosure from ebrewsupply because they still had the enclosures with only one lock on the side (instead of two commonly found on eBay).

I still have to cut out the 22mm holes but there's plenty of time for that.

Moving on to the heatsink....

2012-12-09-11.07.13.jpg  
__________________
rangrr4834 is offline
 
Reply With Quote Quick reply to this message
Old 12-09-2012, 04:27 PM   #3
rangrr4834
Feedback Score: 0 reviews
Recipes 
 
Join Date: Aug 2012
Posts: 41
Liked 5 Times on 4 Posts

Default

I thought I would begin the holes for the SSRs and heatsink also, then make sure it is a good fit. It all worked out really good (and easy) this time.

Hopefully I can get all these holes cut soon so I can move on to the paint. For now (based on price) I plan on getting the enclosure powder coated and possibly having the heatsink anodized a black color. I am still debating on making the heatsink black or leaving it look more industrial and keeping it bare aluminum.

2012-12-09-11.07.24.jpg   2012-12-09-10.59.54.jpg   2012-12-09-11.00.27.jpg   2012-12-09-11.00.11.jpg  
__________________
rangrr4834 is offline
 
Reply With Quote Quick reply to this message
Old 12-11-2012, 02:19 AM   #4
Chazbeer
Feedback Score: 0 reviews
Recipes 
 
Join Date: Oct 2011
Location: Rockledge, FL
Posts: 11
Likes Given: 1

Default

Rangrr


How did your system come out?

__________________
Chazbeer is offline
 
Reply With Quote Quick reply to this message
Old 12-11-2012, 02:22 AM   #5
milesvdustin
Feedback Score: 0 reviews
Recipes 
 
Join Date: Feb 2010
Location: Pensacola, Florida
Posts: 631
Liked 11 Times on 11 Posts
Likes Given: 23

Default

He just started building it.

__________________
Quote:
Originally Posted by djsethall View Post
It's like a big hot douche for my brewery.
milesvdustin is offline
 
Reply With Quote Quick reply to this message
Old 12-11-2012, 05:27 PM   #6
rangrr4834
Feedback Score: 0 reviews
Recipes 
 
Join Date: Aug 2012
Posts: 41
Liked 5 Times on 4 Posts

Default

Quote:
Originally Posted by Chazbeer View Post
Rangrr


How did your system come out?

I need to get the bottom holes done then I will be moving on to painting and the setup. I am finding that the hole cutting and planning takes quite a bunch of time. I have 99% of the components for the exterior and inside so I am hoping for this to go faster after the painting process.

I am still debating anodizing the heatsink....

I will continue to post pics along the way.
__________________
rangrr4834 is offline
 
Reply With Quote Quick reply to this message
Old 12-11-2012, 07:14 PM   #7
rangrr4834
Feedback Score: 0 reviews
Recipes 
 
Join Date: Aug 2012
Posts: 41
Liked 5 Times on 4 Posts

Default

I got the 22mm holes cut out using a Greenlee 1/2" cunduit punch. It worked great! I would highly recommend this method if you either can afford to buy or have a friend that works for electrical or utility companies and you can borrow one.

I also posted a pic of the ground post on the door of my enclosure from ebrewsupply.com after all the holes are cut. This enclosure is nice because there is no cable plate that has to JB welded, there is only one lock on the center of the panel, and the ground post is already in a spot where it doesn't have to be relocated. And no, I do not work for ebrewsupply. I am just impressed with their product.

20121211_135752.jpg   20121211_135938.jpg  
__________________
rangrr4834 is offline
 
Reply With Quote Quick reply to this message
Old 07-29-2013, 03:39 PM   #8
rangrr4834
Feedback Score: 0 reviews
Recipes 
 
Join Date: Aug 2012
Posts: 41
Liked 5 Times on 4 Posts

Default Control Panel Completed

Well, this control panel took quite a bit longer than I planned (both cost and time) but it is all done and working! So here's some pics.



I mounted the panel with an articulating flat panel TV mount that is rated to hold more weight than the panel. I also used regulated switching power supplies instead of the doorbell transformers and adjustable DC power supplies.

Now time to build the rest...

2013-07-26-20.01.19.jpg   2013-07-29-09.10.15.jpg   2013-07-29-09.10.25.jpg   2013-07-29-09.10.40.jpg   2013-07-29-09.11.59.jpg  

__________________
rangrr4834 is offline
 
Reply With Quote Quick reply to this message
Old 07-29-2013, 03:48 PM   #9
rangrr4834
Feedback Score: 0 reviews
Recipes 
 
Join Date: Aug 2012
Posts: 41
Liked 5 Times on 4 Posts

Default

Here's a few more of the inside (sorry for some fuzziness, took with phone):

2013-07-29-09.11.04.jpg   2013-07-29-09.11.51.jpg   2013-07-29-09.11.12.jpg   2013-07-29-09.11.41.jpg   2013-07-26-20.01.23.jpg  

__________________
rangrr4834 is offline
mcangeli Likes This 
Reply With Quote Quick reply to this message
Reply



Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Questions on building a simple control panel on brewstand cookstownbrewer Automated Brewing Forum 0 11-14-2012 03:34 PM
Questions on building a simple control panel on brewstand cookstownbrewer DIY Projects 0 11-14-2012 02:23 PM
Using A Retired Service Panel For A Control Panel kgalle Electric Brewing 2 04-25-2012 11:52 AM
Mounting spa panel guts in control panel kevink Electric Brewing 7 08-20-2011 02:31 AM
Building my control panel one PID with multiple temp probes? Photopilot Equipment/Sanitation 7 02-06-2010 12:22 AM