Default 4 elements, 4 SSRs, 2 PIDs

I want to run 4- 3000w elements (2 in HLT, 2 in BK). I know I'll need 4 SSRs but I want to run 1 PID per tank. Anything wrong with just wiring the SSRs (2 per) in parallel coming off the PID?

__________________
Garyr2973 is offline
 
Reply With Quote Quick reply to this message
Old 11-08-2012, 05:01 PM   #2
jeffmeh
HBT_SUPPORTER.png
Feedback Score: 0 reviews
 
jeffmeh's Avatar
Recipes 
 
Join Date: Feb 2009
Posts: 1,805
Liked 131 Times on 112 Posts
Likes Given: 17

Default

For each pair, say the 2 in the BK, do you ever plan to run one element without the other? I don't know why you would, because the PID can manage the ouput for you. In that case why not just use one 40amp SSR for each pair, and wire the pair of elements in parallel? Again, IANAE, so hopefully someone else can confirm.

__________________
jeffmeh is offline
 
Reply With Quote Quick reply to this message
Old 11-08-2012, 08:07 PM   #3
BadNewsBrewery
Basement Brewer
HBT_SUPPORTER.png
Feedback Score: 0 reviews
 
BadNewsBrewery's Avatar
Recipes 
 
Join Date: Oct 2012
Location: Severn, MD
Posts: 1,072
Liked 108 Times on 89 Posts
Likes Given: 37

Default

The PID should be able to adjust its logic fine, my only question would be amperage - how many amps does the PID put out, and how many amps does the SSR coil draw? As long as 2 SSRs don't need more juice to switch than the PID can provide you should be fine.

__________________
Building a Bad News Brewery - eHERMS

2014:
5gal Scottish Wee Heavy
5gal Saison
15gal American Pale Ale
20gal Belgian Wit (10 dumped)


Keg 1: Apfelwein
Keg 2: Belgian Wit (Failure)
Keg 3: American Pale Ale
Fermenting: Belgian Wit (Take 2)
BadNewsBrewery is online now
 
Reply With Quote Quick reply to this message
Old 11-08-2012, 08:40 PM   #4
jeffmeh
HBT_SUPPORTER.png
Feedback Score: 0 reviews
 
jeffmeh's Avatar
Recipes 
 
Join Date: Feb 2009
Posts: 1,805
Liked 131 Times on 112 Posts
Likes Given: 17

Default

(2 x 3000w) / 240v = 25a. One 40a SSR should be able to drive 2 3000w elements with no problem. The PID is sending control signals over something like 12V DC and is only switching the SSR, so what the SSR is powering is not relevant to the amperage draw of the PID.

Edit: At 120V = 50a, so you would need a higher rated SSR.

__________________
jeffmeh is offline
 
Reply With Quote Quick reply to this message
Old 11-08-2012, 09:21 PM   #5
mateomtb
Feedback Score: 1 reviews
Recipes 
 
Join Date: Jan 2011
Location: Pine, Co
Posts: 122
Liked 7 Times on 7 Posts
Likes Given: 7

Default

I have a BCS but I think this logic is the same. You just need to connect the pid OUT (turn **** on) to both of the ssr's that control those 2 elements. I just ran the OUT to one ssr then hopped the wire over to the next. Then when the PID OUT turns on it activates both ssrs. It doesn't know or care it's connected to more than one ssr, it just sends the low voltage signal to say go. It's just going to keep going on and off to maintain whatever you set it at based on the IN (temp probe).

Not sure on a PID but I had to do this with my multiple element rig because each OUT on the BCS is associated with an IN (temp probe). You can't have 1 IN controlling 2 OUTS so you make 1 OUT control 2 things after it leaves the controller.

Boy I don't know if that makes sense. Forgive me if I'm wrong, as I said I haven't worked with a PID. Maybe someone else can verify.

__________________
mateomtb is offline
 
Reply With Quote Quick reply to this message
Old 11-08-2012, 10:18 PM   #6
jeffmeh
HBT_SUPPORTER.png
Feedback Score: 0 reviews
 
jeffmeh's Avatar
Recipes 
 
Join Date: Feb 2009
Posts: 1,805
Liked 131 Times on 112 Posts
Likes Given: 17

Default

Quote:
Originally Posted by mateomtb View Post
I have a BCS but I think this logic is the same. You just need to connect the pid OUT (turn **** on) to both of the ssr's that control those 2 elements. I just ran the OUT to one ssr then hopped the wire over to the next. Then when the PID OUT turns on it activates both ssrs. It doesn't know or care it's connected to more than one ssr, it just sends the low voltage signal to say go. It's just going to keep going on and off to maintain whatever you set it at based on the IN (temp probe).

Not sure on a PID but I had to do this with my multiple element rig because each OUT on the BCS is associated with an IN (temp probe). You can't have 1 IN controlling 2 OUTS so you make 1 OUT control 2 things after it leaves the controller.

Boy I don't know if that makes sense. Forgive me if I'm wrong, as I said I haven't worked with a PID. Maybe someone else can verify.
I definitely may be missing something, so someone please correct me if that is the case. If you want to control two heating elements simultaneously, why would you not have your 1 out go to 1 sufficiently rated SSR, and have the two elements wired to the SSR in parallel? Having 2 SSRs that are always switching at the same time would work, but with one additional SSR to purchase and to be an additional point of failure.
__________________
jeffmeh is offline
 
Reply With Quote Quick reply to this message
Old 11-08-2012, 10:19 PM   #7
hot_carl
Feedback Score: 0 reviews
Recipes 
 
Join Date: Oct 2011
Location: Houston, TX
Posts: 112
Liked 2 Times on 2 Posts
Likes Given: 2

Default

Why not just run a 6k watt element in each instead of two 3k ones? You end up with less holes and fewer points of failure, both electrically and mechanically (burn out, leaks)

__________________
hot_carl is offline
 
Reply With Quote Quick reply to this message
Old 11-08-2012, 11:27 PM   #8
Garyr2973
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jul 2009
Location: Louisville,KY
Posts: 178
Liked 16 Times on 12 Posts

Default

Thanks for all the replies everyone. I actually didn't think about wiring the elements in parallel but that's a great idea. I will get a bigger SSR and heat sink to match. I'd love to just go with a single bigger element but due to only having 120v, I think a single element would take forever to get water/wort to a boil. I thought about going to a single 3000w element in the HLT then adding a RIMS to help it out but I guess that won't help heating spathe and mash water will it?

__________________
Garyr2973 is offline
 
Reply With Quote Quick reply to this message
Old 11-08-2012, 11:55 PM   #9
jeffmeh
HBT_SUPPORTER.png
Feedback Score: 0 reviews
 
jeffmeh's Avatar
Recipes 
 
Join Date: Feb 2009
Posts: 1,805
Liked 131 Times on 112 Posts
Likes Given: 17

Default

Actually, in looking at your other thread, it looks like you are planning to run two separate 120v circuits, one for each element. In that case you may need the two SSRs. You can certainly run two outputs in parallel from an SSR, but you actually have two inputs as well. Someone with more knowledge than I will have to chime in here.

__________________
jeffmeh is offline
 
Reply With Quote Quick reply to this message
Old 11-09-2012, 12:47 AM   #10
Garyr2973
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jul 2009
Location: Louisville,KY
Posts: 178
Liked 16 Times on 12 Posts

Default

Ill have a total of 3 circuits but one will be used for the pumps. I was thinking one would power the pumps (2), and one circuit for each of the two elements in the HLT. Then when it's time for the boil, I'd flip the switch to move the two circuits to the boil kettle? Does that make sense?

__________________
Garyr2973 is offline
 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
$20 PIDs vrs Auberins $45 PIDs? bellinmi88 Electric Brewing 6 06-14-2012 02:45 PM
SSRs are for Chumps craley1 DIY Projects 10 08-27-2010 07:31 PM