Home Brew Forums

Home Brew Forums (http://www.homebrewtalk.com/forum.php)
-   Electric Brewing (http://www.homebrewtalk.com/f170/)
-   -   120V Small Batch Brewing Setup (http://www.homebrewtalk.com/f170/120v-small-batch-brewing-setup-217630/)

DeeDub76 01-13-2011 03:21 PM

120V Small Batch Brewing Setup
 
2 Attachment(s)

I'm still in the early stages of accumulating all required pieces to get this build underway, but thought I would go ahead and share what I have so far.

The vessels are 5 gallon. I plan on doing small 3 gallon batches.

Attachment 19197

Attachment 19198


DeeDub76 01-13-2011 03:21 PM

120V Small Batch Brewing Setup
 
2 Attachment(s)

I'm still in the early stages of accumulating all required pieces to get this build underway, but thought I would go ahead and share what I have so far.

The vessels are 5 gallon. I plan on doing small 3 gallon batches.

Attachment 19197

Attachment 19198


DeeDub76 01-19-2011 01:31 PM

5 Attachment(s)

A few parts came in allowing me to build the tri-clamp heating element.
Attachment 19398
Attachment 19399
Some milling was required in the box so the heating element would sit properly.
Attachment 19400
Attachment 19401
Tri-clamp allows quick removal for cleaning or element replacement.
Attachment 19402
A few sanitary ferrules that will be welded to the vessel hopefully within the next week.


DeeDub76 01-19-2011 01:31 PM

5 Attachment(s)

A few parts came in allowing me to build the tri-clamp heating element.
Attachment 19398
Attachment 19399
Some milling was required in the box so the heating element would sit properly.
Attachment 19400
Attachment 19401
Tri-clamp allows quick removal for cleaning or element replacement.
Attachment 19402
A few sanitary ferrules that will be welded to the vessel hopefully within the next week.


DeeDub76 01-19-2011 01:31 PM

5 Attachment(s)

A few parts came in allowing me to build the tri-clamp heating element.
Attachment 19398
Attachment 19399
Some milling was required in the box so the heating element would sit properly.
Attachment 19400
Attachment 19401
Tri-clamp allows quick removal for cleaning or element replacement.
Attachment 19402
A few sanitary ferrules that will be welded to the vessel hopefully within the next week.


DeeDub76 01-19-2011 01:31 PM

5 Attachment(s)

A few parts came in allowing me to build the tri-clamp heating element.
Attachment 19398
Attachment 19399
Some milling was required in the box so the heating element would sit properly.
Attachment 19400
Attachment 19401
Tri-clamp allows quick removal for cleaning or element replacement.
Attachment 19402
A few sanitary ferrules that will be welded to the vessel hopefully within the next week.


DeeDub76 01-19-2011 01:31 PM

5 Attachment(s)

A few parts came in allowing me to build the tri-clamp heating element.
Attachment 19398
Attachment 19399
Some milling was required in the box so the heating element would sit properly.
Attachment 19400
Attachment 19401
Tri-clamp allows quick removal for cleaning or element replacement.
Attachment 19402
A few sanitary ferrules that will be welded to the vessel hopefully within the next week.


DeeDub76 02-04-2011 01:50 PM

5 Attachment(s)

Progress is slow as pieces for this build trickle in. Well that and having money to buy those pieces. Kettles have been welded and ready for installation

Unistrut installed for control panel mounting
Attachment 20090
Attachment 20091

Holes drilled for bottom draining kettles and RTD wires.
Attachment 20092
Attachment 20093
Attachment 20094


DeeDub76 02-04-2011 01:50 PM

5 Attachment(s)

Progress is slow as pieces for this build trickle in. Well that and having money to buy those pieces. Kettles have been welded and ready for installation

Unistrut installed for control panel mounting
Attachment 20090
Attachment 20091

Holes drilled for bottom draining kettles and RTD wires.
Attachment 20092
Attachment 20093
Attachment 20094


DeeDub76 02-04-2011 01:50 PM

5 Attachment(s)

Progress is slow as pieces for this build trickle in. Well that and having money to buy those pieces. Kettles have been welded and ready for installation

Unistrut installed for control panel mounting
Attachment 20090
Attachment 20091

Holes drilled for bottom draining kettles and RTD wires.
Attachment 20092
Attachment 20093
Attachment 20094



All times are GMT. The time now is 06:44 AM.

Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.