Not every thing is hooked up yet. I still need heating elements for the HLT and BK (still using gas now), and to find a good float switch. But the controller is programmed and ready for them. Just.. need... more... time...
That control panel will be added to my collection of needed parts for my future brewing system even before the systems keggles get modified to my design. Have a safe and prosperous New Years. Take care Adam and the family.