HBT 2014 Big Giveaway - 4/10 Re-Draw Winners Posted!

Home Brew Forums > Home Brewing Beer > Equipment/Sanitation > Phase 2 brewery construction photo




Reply
 
LinkBack Thread Tools Display Modes
Old 07-21-2008, 03:30 AM   #31
kladue
Senior Member
Feedback Score: 0 reviews
Recipes 
 
Join Date: Dec 2006
Location: Turner, Oregon, Oregon most of the time now
Posts: 2,291
Liked 43 Times on 40 Posts

Default

Have enjoyed 4 summers in chandler rebuilding and building Intel facilities, not a lot of fun working outdoors when it is 118 degrees, even less when you have to put on a saranex chemical suit above 100 degrees F. Looks I will be back to springerville in october for a week or two to get a couple people started on a steam turbine job then I hope to head back to oregon again. Here are a few shots of the system taken after the wet testing today. http://picasaweb.google.com/kevin.ladue/WetTestProgressPhotoS Still have to make false bottom for mash tun, screened pickup tube for boil kettle, vapor hood and exhaust system for boil kettle, and put together the water chillers, pump and 50L keg for the glycol cooling system.



__________________

Last edited by kladue; 07-23-2008 at 10:05 PM.
kladue is offline
 
Reply With Quote Quick reply to this message
Old 07-23-2008, 04:24 PM   #32
kladue
Senior Member
Feedback Score: 0 reviews
Recipes 
 
Join Date: Dec 2006
Location: Turner, Oregon, Oregon most of the time now
Posts: 2,291
Liked 43 Times on 40 Posts

Default

Here are a couple shots of the screw conveyor system, internal screw is 1/4" copper over 1-1/4" copper, outer is 2" Od stainless, drive is 1/8 Hp TEFC motor with 1" drive and 4" driven pulleys. http://picasaweb.google.com/kevin.ladue/ScrewConveyor/photo#5188941875307268178



__________________
kladue is offline
 
Reply With Quote Quick reply to this message
Old 07-23-2008, 07:39 PM   #34
beerthirty
big beers turn my gears
Feedback Score: 0 reviews
 
beerthirty's Avatar
Recipes 
 
Join Date: May 2008
Location: Phoenix AZ
Posts: 2,651
Liked 21 Times on 11 Posts

Default

that looks nice. the only thing I would change is to move the rust to the outside of the mash tun.

__________________
Quote:
Originally Posted by the_bird View Post
"I've got a fever... and the only prescription is, MORE CARBOYS!"
primary- Tangerine Dream, SWMBO slayer,
serving- amber ale hop experiment #6, Roggenbier, apfelwine
planning- Cru?
conditioning- 9/9/09 barleywine
Drink water?... Never, fish fornicate in it.--- W.C. Fields
Most problems can be solved with the proper application of force.
beerthirty is offline
 
Reply With Quote Quick reply to this message
Old 07-23-2008, 10:04 PM   #35
kladue
Senior Member
Feedback Score: 0 reviews
Recipes 
 
Join Date: Dec 2006
Location: Turner, Oregon, Oregon most of the time now
Posts: 2,291
Liked 43 Times on 40 Posts

Default

That is yeast residue left on inside of keg when it was opened, it will come off during caustic cleaning after internal parts are finished. Outside gets 1" of insulation and 20Gauge SS skin with latches to faciltate removal of jacket for cleaning.

__________________
kladue is offline
 
Reply With Quote Quick reply to this message
Old 07-24-2008, 05:34 PM   #36
beerthirty
big beers turn my gears
Feedback Score: 0 reviews
 
beerthirty's Avatar
Recipes 
 
Join Date: May 2008
Location: Phoenix AZ
Posts: 2,651
Liked 21 Times on 11 Posts

Default

as I found out this morning when I cut open 2 sankes that had wheat in them.



__________________
Quote:
Originally Posted by the_bird View Post
"I've got a fever... and the only prescription is, MORE CARBOYS!"
primary- Tangerine Dream, SWMBO slayer,
serving- amber ale hop experiment #6, Roggenbier, apfelwine
planning- Cru?
conditioning- 9/9/09 barleywine
Drink water?... Never, fish fornicate in it.--- W.C. Fields
Most problems can be solved with the proper application of force.
beerthirty is offline
 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options
Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Phase 2 brewery build progress shots kladue DIY Projects 207 05-24-2011 04:37 AM
Brewery Construction cyberbackpacker DIY Projects 45 08-24-2009 05:06 PM
New brewery construction Rick500 Indiana HomeBrew Forum 2 05-14-2009 04:37 AM
Phase 2 brewery boiler testing kladue DIY Projects 0 10-18-2008 02:47 AM