Hey guys thanks for the interest. Yes we have a facebook page.
Here
I have been pretty busy getting things together. I decided to build a system. I am using 55 gallon stainless drums. I am doing a double batch system. 2 mash tuns, 2 boil kettles so i can do about 3 bbl batches. We purchased 130 gallon fermenters from
Glacier tanks. Right now my barrels are getting fittings welded into them. As soon as they are back I will start the build out and post a build thread.
We hope to have building permits next week for the interior of the building. I am doing most of the general construction myself. I will do much of the electrical and my neighbor will help and pull the permit. Plumbing is the only thing we are struggling with at the moment. Can't seem to find the "bro" deal yet for that. Right now our quotes are coming in pretty high. So that is our next hurdle.
All paperwork is in with the TTB and the state. We are now just playing the waiting game on that front. We call them every week to make sure they don't need anything more from us. Overall things are moving along. If all goes well we should be opening the doors in November before the ski season starts.