Killer build.

I am putting together stuff to build a similar rig using 2 kegs and a dual element RIMS, one for recirculated mashing, and then both for fly sparging. I think mine will only use one pump too. I even kicked around the idea of a dual element keggle like what you'd done.

I love the built in chiller idea. I was planning on doing a CFC, but after seeing yours, might just modify my plans.

__________________
Monkey Wrench Brewing
MonkeyWrench is offline
 
Reply With Quote Quick reply to this message
Old 01-24-2010, 04:48 AM   #52
The Pol
Feedback Score: 0 reviews
Recipes 
 
Join Date: Feb 2007
Posts: 11,616
Liked 53 Times on 50 Posts

Default

Quote:
Originally Posted by KiltedCorpse View Post
Killer build.

I am putting together stuff to build a similar rig using 2 kegs and a dual element RIMS, one for recirculated mashing, and then both for fly sparging. I think mine will only use one pump too. I even kicked around the idea of a dual element keggle like what you'd done.

I love the built in chiller idea. I was planning on doing a CFC, but after seeing yours, might just modify my plans.
The dual element kettle and RIMS is unnecessary, but the additional cost is minimal... at least I dont have to hear how "weak" my system is again

The integral chiller is nice, costly, but nice
__________________
The Pol is offline
 
Reply With Quote Quick reply to this message
Old 01-24-2010, 04:54 AM   #53
The Pol
Feedback Score: 0 reviews
Recipes 
 
Join Date: Feb 2007
Posts: 11,616
Liked 53 Times on 50 Posts

Default

All of the stuff for the stand should be here in a week or so... then I can get all of the major components mounted. Once that is completed (1-2 weeks), then I can get the BCS and SSRs installed and fire it up!

__________________
The Pol is offline
 
Reply With Quote Quick reply to this message
Old 01-24-2010, 03:13 PM   #54
MonkeyWrench
Feedback Score: 0 reviews
Recipes 
 
Join Date: Oct 2009
Location: Republic of Cascadia
Posts: 349
Liked 2 Times on 2 Posts
Likes Given: 1

Default

Quote:
Originally Posted by The Pol View Post
The dual element kettle and RIMS is unnecessary, but the additional cost is minimal... at least I dont have to hear how "weak" my system is again

The integral chiller is nice, costly, but nice
I was going to run a 120v LWD element for RIMS function then kick on a 240v 4500 HWD element for fly sparging. I know with the talk about HWD not actually scorching, maybe I can run 2 HWD elements at around 3500 each so I can still run off my 30A outlet and have the power to fly sparge my 38* tap water. I'd rather over engineer the first time, then have to re-engineer a second time.

Also, for your dual elements, I'm assuming you will be running on 1 PID and 1 thermocouple, but 2 SSRs, one for each element? This would be a more cost effective way for me as well because I was going to run one PID for RIMS and one PID for sparging, each with their own thermocouple.

Ya, your stainless tubing is nice, but too rich for my blood. If I incorporate your idea, it will be with copper tubing instead.
__________________
Monkey Wrench Brewing

Last edited by MonkeyWrench; 01-24-2010 at 03:15 PM.
MonkeyWrench is offline
 
Reply With Quote Quick reply to this message
Old 01-24-2010, 04:20 PM   #55
The Pol
Feedback Score: 0 reviews
Recipes 
 
Join Date: Feb 2007
Posts: 11,616
Liked 53 Times on 50 Posts

Default

Quote:
Originally Posted by KiltedCorpse View Post
I was going to run a 120v LWD element for RIMS function then kick on a 240v 4500 HWD element for fly sparging. I know with the talk about HWD not actually scorching, maybe I can run 2 HWD elements at around 3500 each so I can still run off my 30A outlet and have the power to fly sparge my 38* tap water. I'd rather over engineer the first time, then have to re-engineer a second time.

Also, for your dual elements, I'm assuming you will be running on 1 PID and 1 thermocouple, but 2 SSRs, one for each element? This would be a more cost effective way for me as well because I was going to run one PID for RIMS and one PID for sparging, each with their own thermocouple.

Ya, your stainless tubing is nice, but too rich for my blood. If I incorporate your idea, it will be with copper tubing instead.
I am sure you know this, but it bears pointing out, 7000W would run you just over 29A, leaving you no room to run a single pump, unless of course you are running them on another circuit, which you may.

The on demand water heater idea should work, mathematically, with 7000W in the heater.

EDIT
This is BCS controlled... EACH element will have (2) SSRs and have its OWN PID/Control output. SO, the RIMS will have (4) SSRs and (2) controls to run it, the Kettle will have (4) SSRs and (2) PID/control outputs as well... The pumps will each have a single SSR and a single control output, each

This will allow me and the BCS to operate the kettle and the RIMS on a single elelement when it is programmed to do so, and during certain processes run both elements with full PID control or manual, or ON/OFF control.

The kettle will have the option of temp. controlled PID, but that will not be used for the boil, only duty cycle for that.

The integrated coil was pricey, $232 or so, but the 50' copper chiller was $15 MORE than the 50' SS chiller at Midwest... SS and copper are very close in price when it comes to tubing. The fittings were mucho pricey
__________________

Last edited by The Pol; 01-24-2010 at 05:12 PM.
The Pol is offline
 
Reply With Quote Quick reply to this message
Old 01-24-2010, 05:06 PM   #56
Hermit
Feedback Score: 0 reviews
Recipes 
 
Join Date: Nov 2009
Location: Alternate Universe
Posts: 2,226
Liked 61 Times on 55 Posts
Likes Given: 10

Default

Quote:
Originally Posted by The Pol View Post
I am sure you know this, but it bears pointing out, 7000W would run you just over 29A, leaving you no room to run a single pump, unless of course you are running them on another circuit, which you may.
Give or take 10% on the circuit breaker. I had a customer running a dryer on a 20 amp circuit for years. The dryer was rated at 30 but will draw about 21 or so under full load. Well, after some years the circuit breaker starts tripping and I get the call. They didn't want to hear it was a feed problem because it had worked fine for so many years....... (I pointed to the tag on the dryer that said 30 amps and the breaker that said 20 and that seemed to help......)

That said, notice the dryer draws about 2/3's the rated current.
__________________
Hermit is offline
 
Reply With Quote Quick reply to this message
Old 01-24-2010, 05:16 PM   #57
CodeRage
Death by Magumba!
HBT_LIFETIMESUPPORTER.png
Feedback Score: 0 reviews
 
CodeRage's Avatar
Recipes 
 
Join Date: Aug 2007
Location: Melbourne, Fl
Posts: 2,254
Liked 29 Times on 16 Posts
Likes Given: 5

Default

Quote:
Originally Posted by KiltedCorpse View Post
I was going to run a 120v LWD element for RIMS function then kick on a 240v 4500 HWD element for fly sparging. I know with the talk about HWD not actually scorching, maybe I can run 2 HWD elements at around 3500 each so I can still run off my 30A outlet and have the power to fly sparge my 38* tap water. I'd rather over engineer the first time, then have to re-engineer a second time.
On 30 Amps I would say one 1500W and a 4500W will get you where you need to be. with some extra amps to to spare.
__________________
Brutus 20e build | Electrical Primer for Brewers | Auber SYL-2362A2 PID Install & Config
So as I am walking out the door this morning I think to my self:
"self, going to work on Monday is like knowing you're going to get kicked in the nuts. You just don't know when or by who"
CodeRage is offline
 
Reply With Quote Quick reply to this message
Old 01-24-2010, 05:36 PM   #58
MonkeyWrench
Feedback Score: 0 reviews
Recipes 
 
Join Date: Oct 2009
Location: Republic of Cascadia
Posts: 349
Liked 2 Times on 2 Posts
Likes Given: 1

Default

Ya, I was planning on using a 110v pump on a separate outlet, but I have considered upgrading my 240v outlet to 40A (if the wire is big enough) and running a 240v pump instead.

It might work as is, or not. I suppose those 3500w elements have a tolerance as well. My luck would be that I have a -10% outlet and 2 +10% elements.

I missed the BCS controller detail. I'll surely be keeping an eye on this build.

Sorry for the hijack, back to the bling!

__________________
Monkey Wrench Brewing

Last edited by MonkeyWrench; 01-24-2010 at 05:39 PM.
MonkeyWrench is offline
 
Reply With Quote Quick reply to this message
Old 01-25-2010, 06:00 PM   #59
The Pol
Feedback Score: 0 reviews
Recipes 
 
Join Date: Feb 2007
Posts: 11,616
Liked 53 Times on 50 Posts

Default

Final orders placed today...

Everything will be in house soon to complete the build.

__________________
The Pol is offline
 
Reply With Quote Quick reply to this message
Old 01-25-2010, 06:18 PM   #60
Ohio-Ed
HBT_LIFETIMESUPPORTER.png
Feedback Score: 0 reviews
 
Ohio-Ed's Avatar
Recipes 
 
Join Date: Nov 2008
Posts: 2,072
Liked 19 Times on 18 Posts

Default

Quote:
Originally Posted by The Pol View Post
Final orders placed today...

Everything will be in house soon to complete the build.
Wow... you are on fire!

What do you have planned for insulating your vessels?
I'm guessing it will have to be removable so you can use all that bling as a mirror to shave with in the mornings.

Ed
__________________
Ohio-Ed is offline
 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
NEED HELP! I want to build a brewery dregus Equipment/Sanitation 2 08-10-2009 01:11 PM
500 watt or other low watt elements JVD_X DIY Projects 6 02-21-2009 09:08 PM