Default Electric Rig Build

Well, decided to become a paying member since I've gotten so much info from this forum just by lurking... My brother, father and I are in the process of welding up the steel for this rig. Just wanted to get some input on the plumbing and overall design.

Material we have already: Steel framing (all 1" square stock) and 3 sanke kegs.
We still need copper, valves, high temp PEX, march pump and the elements. I'm currently pricing/looking up whats best for all these now.

On the output side of the pump the two J shaped pieces are what I call "universal fillers" that can be hung over the side of the kegs. To start our rig will be manual, but in the future we might go with brewtroller or a similar controller. With this design and only one pump we are limited to batch sparging but later we could add a second pump for fly.



So any input is appreciate; comments, concerns, criticism, anything.

Edit: The key in the plumbing picture should say 1/2" tubing...

rig-assembled2.jpg   rig.jpg  
__________________

RJS625 is offline
 
Reply With Quote Quick reply to this message
Old 12-27-2009, 11:05 AM   #2
Bobby_M
Vendor and Brewer
HBT_SPONSOR.png
Vendor Ads 
Feedback Score: 3 reviews
 
Bobby_M's Avatar
Recipes 
 
Join Date: Aug 2006
Location: Whitehouse Station, NJ
Posts: 22,476
Liked 1170 Times on 775 Posts
Likes Given: 29

Default

What's the "flexible element" around the mash tun?

__________________

Welcome to BrewHardware.com. I love you.
New 100% Stainless Steel Heating Elements are IN! ULWD 5500w Ripple, 2000w, 1500w, etc
Chugger Pumps, Pump Kits, Camlocks, Sightglasses, Clear USA made Silicone Tubing, RIMS, Electric Install Parts, etc.

Bobby_M is offline
 
Reply With Quote Quick reply to this message
Old 12-28-2009, 01:13 AM   #3
RJS625
Feedback Score: 0 reviews
Recipes 
 
Join Date: Apr 2009
Posts: 25
Default

Quote:
What's the "flexible element" around the mash tun?

Something similar to this:
http://www.grainger.com/Grainger/items/4GY19?Pid=search

or

http://www.grainger.com/Grainger/items/3CDA6?Pid=search

Then we plan on insulating over top of the element
__________________
RJS625 is offline
 
Reply With Quote Quick reply to this message
Old 12-28-2009, 01:59 AM   #4
Ohio-Ed
HBT_LIFETIMESUPPORTER.png
Feedback Score: 0 reviews
 
Ohio-Ed's Avatar
Recipes 
 
Join Date: Nov 2008
Posts: 2,072
Liked 19 Times on 18 Posts

Default

What is the reasoning behind a horizontal element in the HLT and vertical in the BK?

__________________
Ohio-Ed is offline
 
Reply With Quote Quick reply to this message
Old 12-28-2009, 02:11 AM   #5
RJS625
Feedback Score: 0 reviews
Recipes 
 
Join Date: Apr 2009
Posts: 25
Default

Quote:
What is the reasoning behind a horizontal element in the HLT and vertical in the BK?

For the HLT I plan on draining off the bottom no need to leave any behind. So we can just punch a hole and have the element run through a bulkhead.

For the BK we plan on whirlpooling; so I figure its best to have the drain on a bulkhead off the side so we leave the trub.

Both kegs were cut open from the bottom leaving the standard opening on the bottom. I figure we could make some sort of plate that will hold the element (for BK) or a piece of 1/2" tubbing (for HLT) and lock in with the normal snap ring.
__________________
RJS625 is offline
 
Reply With Quote Quick reply to this message
Old 12-28-2009, 02:10 PM   #6
Bobby_M
Vendor and Brewer
HBT_SPONSOR.png
Vendor Ads 
Feedback Score: 3 reviews
 
Bobby_M's Avatar
Recipes 
 
Join Date: Aug 2006
Location: Whitehouse Station, NJ
Posts: 22,476
Liked 1170 Times on 775 Posts
Likes Given: 29

Default

I suppose I can't find any fault in maintaining mash temps with a wrap around heat source. I was going to recommend looking into HERMS or RIMS but frankly, your plan seems like a lot less hassle for not having to move wort. Proponents of constant recirculation like the clarity of the runoff but it only takes a 5 minute vorlauf to acheive and you won't have to worry about grain bed compaction. I wouldn't expect having the ability to do step mashes with the heat source, but you can still use infusion to move the temps.

__________________

Welcome to BrewHardware.com. I love you.
New 100% Stainless Steel Heating Elements are IN! ULWD 5500w Ripple, 2000w, 1500w, etc
Chugger Pumps, Pump Kits, Camlocks, Sightglasses, Clear USA made Silicone Tubing, RIMS, Electric Install Parts, etc.

Bobby_M is offline
 
Reply With Quote Quick reply to this message
Old 12-29-2009, 10:36 PM   #7
RJS625
Feedback Score: 0 reviews
Recipes 
 
Join Date: Apr 2009
Posts: 25
Default

Quote:
I suppose I can't find any fault in maintaining mash temps with a wrap around heat source. I was going to recommend looking into HERMS or RIMS but frankly, your plan seems like a lot less hassle for not having to move wort. Proponents of constant recirculation like the clarity of the runoff but it only takes a 5 minute vorlauf to acheive and you won't have to worry about grain bed compaction. I wouldn't expect having the ability to do step mashes with the heat source, but you can still use infusion to move the temps.
Bobby, using the wrap to up the temp and stiring the mash would not work for step mashing?

One question I had for anyone that can answer it, while we are still running the rig manually and not off of a controller do I need relays or anything for the elements or can I simply buy A/C elements and have a switch that allows us to turn them on and off based on temps of each vessel?

Also, I forgot that our plan was to allow the mashtun to swing and empty the spent grain easily. I'll probably end up hooking the mashtun up with PEX also. Any concerns on cleaning the manifold? I'm wondering if it will end up gummed up with husks and sugar. We'll flush the whole system with hot water/sanitizer after every brew but I wonder if some residue will still build up. I'll probably have a screw on cap on the end of the manifold that can be opened so we can brush it out as needed.
__________________
RJS625 is offline
 
Reply With Quote Quick reply to this message
Old 12-29-2009, 10:54 PM   #8
The Pol
Feedback Score: 0 reviews
Recipes 
 
Join Date: Feb 2007
Posts: 11,774
Liked 80 Times on 68 Posts
Likes Given: 14

Default

Quote:
Originally Posted by RJS625 View Post
Bobby, using the wrap to up the temp and stiring the mash would not work for step mashing?

No, 1500W? Outside the mash? That will never step mash... using a RIMS or HERMS is tough enough in most systems.

One question I had for anyone that can answer it, while we are still running the rig manually and not off of a controller do I need relays or anything for the elements or can I simply buy A/C elements and have a switch that allows us to turn them on and off based on temps of each vessel?

Yup you can do that, no need for SSRs or anything.

Also, I forgot that our plan was to allow the mashtun to swing and empty the spent grain easily. I'll probably end up hooking the mashtun up with PEX also. Any concerns on cleaning the manifold? I'm wondering if it will end up gummed up with husks and sugar.

Use Oxiclean or PBW and it will clean nicely. Hot water may not cut it after numerous brews.

We'll flush the whole system with hot water/sanitizer after every brew but I wonder if some residue will still build up. I'll probably have a screw on cap on the end of the manifold that can be opened so we can brush it out as needed.
I am in the process of a new build too... good luck with yours.
__________________
The Pol is offline
 
Reply With Quote Quick reply to this message
Reply



Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Gonna build an Electric Boiler...how to control? ApolloSpeed Brew Stands 55 04-22-2011 08:30 PM
My Electric Home Brewery Build skarude Brew Stands 26 06-11-2010 11:32 PM
57 gallon electric HLT build Brewpastor Kettles, Mash Tuns, & Hot Liquor Tanks 42 12-31-2009 10:40 PM
My Weldless Electric HERMS build jcdillin Brew Stands 94 12-04-2009 01:11 AM
Electric HLT build list xxdcmast All Grain & Partial Mash Brewing 2 04-05-2009 05:50 PM



Newest Threads

LATEST SPONSOR DEALS