New Giveaway - Wort Monster Conical Fermenter!

Home Brew Forums > Home Brewing Beer > Equipment/Sanitation > CFC and Mash Tun Build




Reply
 
LinkBack Thread Tools Display Modes
Old 03-15-2010, 03:38 AM   #1
Shepherd5
Feedback Score: 0 reviews
Recipes 
 
Join Date: Mar 2010
Location: Chula Vista
Posts: 147
Liked 1 Times on 1 Posts

Default CFC and Mash Tun Build

I had a productive day today building a 20 foot counter flow chiller and a 10 gallon mash tun. I could have saved maybe ten dollars, but I bought two extra fittings for the CFC not called for in the DIY section of this forum because of what Home Depot had in stock, so I had to improvise a bit. I also added a 1/4 inch thick thick washer/spacer behind the ball valve because four 5/8" washers.spacers were not enough to tighten the ball valve assembly. It was pretty easy! I used the directions posted in the DIY section for both of these projects. Question: Is twenty feet an adequate length for a counter flow chiller, because Home Depot only had 20 foot lengths of 3/8" copper tubing?







__________________

Last edited by Shepherd5; 03-15-2010 at 03:57 AM.
Shepherd5 is offline
 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options
Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Sanke Mash Tun Build Hoosier DIY Projects 19 11-29-2009 12:07 PM
$58 doller mash tun build ks_medic DIY Projects 1 11-25-2009 07:09 PM
100 gallon mash tun build Cold_Steel DIY Projects 30 09-25-2009 11:41 PM
Time to build a Mash Tun Panzermann All Grain & Partial Mash Brewing 25 03-05-2009 06:01 PM
Did I manage to build a mash tun for $0 out of pocket? Ryan_PA Equipment/Sanitation 5 12-11-2006 09:34 PM