Kegconnection Complete Starter Kit and More Giveaway!


Home Brew Forums > Home Brewing Beer > Equipment/Sanitation > Auber wiring and programing

Reply
 
LinkBack Thread Tools
Old 10-20-2009, 07:56 AM   #1
squidtpd
Feedback Score: 0 reviews
Recipes 
 
Join Date: Oct 2009
Location: ohio
Posts: 24
Default Auber wiring and programing

I'm upgrading my old rims system (mashmate 1600). I just received my auber syl-2362, rtd sensor and 25a ssr. The rtd has 3 connections-2 red and 1 blue. What terminal does the blue connect 8,9 or 10? Could some one please show me a simple diagram to wire this unit for a rims system? I would like to use a panel switch to turn on the wort pump then the pid and a house gfi plug to protect the system. I mainly brew ales. So, I'm interested in holding one temperature in the mash tun. How is this programed into this unit? Sorry to sound like such a rock head, but I just want to get everything installed correctly. Thanks for any input.

__________________
squidtpd is offline
 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Auber instraments?? kickflip_mj Equipment/Sanitation 3 03-31-2010 06:14 PM
Auber PID SYL-2352 undocumented bug passedpawn DIY Projects 10 11-06-2009 06:45 PM
Love TS programing/settings navigation GamePreserve Equipment/Sanitation 1 11-06-2009 01:54 AM
Wiring Auber PIDs for Brutus Build gruversm DIY Projects 25 06-30-2009 11:09 PM
PROPS to AUBER INST. The Pol Equipment/Sanitation 4 12-19-2008 12:31 AM