Boerderij Kabouter Brewery Design Series: 2010 hardplumbed system
Posted 09-01-2009 at 02:18 PM by Boerderij_Kabouter
Here is the 2010 system I have been Jonesing about for a while. It is a Brutus 20 with some tweaks. All electric, build in HERMS/Chiller, and fully hard-plumbed. I would ideally operate this with four solenoids (in green and red) with switches on the control panel (I didn't add them, sorry).
Looks pretty sweet IMO.
Here is the schematic:

Below is a typical brewday, green valves are on, gray valves are off. I tried to use colors to indicate where flow is going.





And here are some screen shots of the actual design:




Looks pretty sweet IMO.
Here is the schematic:

Below is a typical brewday, green valves are on, gray valves are off. I tried to use colors to indicate where flow is going.





And here are some screen shots of the actual design:




Total Comments 1
Comments
|
|
I'd like to act like I had some clue what the hell's going on here, but I'm sure any comment would just demonstrate my total ignorance. It looks cool, though.
|
Posted 09-02-2009 at 07:15 PM by doggage
|
Recent Blog Entries by Boerderij_Kabouter
- How Many Watts do you need for my Boil Kettle or Hot Liquor Tun??? Math involved. (06-16-2010)
- Do I have turbulent flow in my chiller? (10-07-2009)
- Its cool to be a beer snob... NOT! (09-25-2009)
- Boerderij Kabouter Brewery Design Series: 2010 hardplumbed system (09-01-2009)
- Boerderij Kabouter Brewery Design Series: 2010 - Ten gallon full brewery (08-28-2009)